Similar Projects
C Washburn, Bayfield Street Construction / Pavement Replacement
Infrastructure
Conception
$6,000,000 CJ est. value
Washburn, WI 54891

C Washburn, Bayfield Street Construction / Pavement Replacement
Infrastructure
Conception
$6,000,000 CJ est. value
Washburn, WI 54891

Cultural Center
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Bayfield, WI 54814

Road Gravel
Term Contract
Post-Bid
Washburn, WI 54891

Paving
Infrastructure
Post-Bid
$386,000 est. value
Namekagon, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Drummond - USH 2 Cth East to USH 2
Infrastructure
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

South Maple Hill Asphalt Overlay
Infrastructure
Post-Bid
$240,000 est. value
Washburn, WI 54891

Brule - Ino, Sznaider Road to CTH A; Wentworth - Ino, Clevedon Road to Sznaider Road;
Infrastructure
Results
$100,000 est. value

South Maple Hill Road Grubbing Project - 2022
Infrastructure
Post-Bid
$160,000 est. value
Washburn, WI 54891

CTH J Pavement Replacement
Infrastructure
Results
WI

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Crack Filling
Infrastructure
Post-Bid
$120,000 CJ est. value
Russell, WI 54814

Last Updated 05/08/2023 06:01 PM
Project Title

Bayfield County Highway Microgrid Project

Physical Address View project details and contacts
City, State (County) Bayfield, WI 54814   (Bayfield County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Installation and Integration with Solar PV System, Natural Gas Generator Integration, Electric Vehicle Supply Equipment Installation The Bayfield County Garage Microgrid Project's scope of work: 1. Installing the 60 kW / 100 kWh BESS. This system will comprise two 30 kW SolArk inverters, model 30k-3p-208, along with 4 battery storage stacks of ~24 kWh each at the Bayfield County Main Highway garage in Washburn in the electrical room, aka "Old Boiler Room" (see engineering plan). Integrating the BESS with the existing solar PV and generator to form a microgrid when disconnected from the grid using the existing Automatic Transfer Switch (ATS). The BESS and inverters are being procured and paid by the County. 2. Procure and install one 80A JuiceBox EVSE unit and install one Ford Pro Charger EVSE (procured by the county) on the garage existing service. 3. Installing all needed balance of system components including communications and non-utility metering specified below

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents