Last Updated | 05/08/2023 06:01 PM |
Project Title | Bayfield County Highway Microgrid Project |
Physical Address | View project details and contacts |
City, State (County) | Bayfield, WI 54814 (Bayfield County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $90,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installation and Integration with Solar PV System, Natural Gas Generator Integration, Electric Vehicle Supply Equipment Installation The Bayfield County Garage Microgrid Project's scope of work: 1. Installing the 60 kW / 100 kWh BESS. This system will comprise two 30 kW SolArk inverters, model 30k-3p-208, along with 4 battery storage stacks of ~24 kWh each at the Bayfield County Main Highway garage in Washburn in the electrical room, aka "Old Boiler Room" (see engineering plan). Integrating the BESS with the existing solar PV and generator to form a microgrid when disconnected from the grid using the existing Automatic Transfer Switch (ATS). The BESS and inverters are being procured and paid by the County. 2. Procure and install one 80A JuiceBox EVSE unit and install one Ford Pro Charger EVSE (procured by the county) on the garage existing service. 3. Installing all needed balance of system components including communications and non-utility metering specified below |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |