Similar Projects
Replace and Upgrade to 12" Main on 12th Street Marian to Laird - City of Hastings
Infrastructure
Conception
$300,000 CJ est. value
Hastings, NE 68901

Replace and Upgrade Main on Marian Road from 7th Street to 9th Street - City of Hastings
Infrastructure
Conception
$350,000 CJ est. value
Hastings, NE 68901

Kearney Warehouse
New Construction
Design
Kearney, NE

Lexington Self Storage - Phase 2
New Construction - 36,000 SF
Design
$1,400,000 est. value
Lexington, NE

Site Grading Sterling 115kv Substation
Infrastructure
Bidding
$40,000 CJ est. value
Albion, NE 68620

Siouxland Freedom Park Facility Improvements
Infrastructure
Bidding
$950,000 CJ est. value
South Sioux City, NE 68776

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

District 5 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

2021 Cemetery North Addition - Phase I
Addition, Infrastructure
Results
Kearney, NE

Yanney Park Maintenance Building
New Construction - 3,000 SF
Results
$400,000 to $600,000 est. value
Kearney, NE

Heartwell Renewables Diesel Production Plant
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Hastings, NE 68901

Lexington Veterans Pavilion at Kirkpatrick Memorial Park
Infrastructure
Construction
$1,160,000 CJ est. value
Lexington, NE 68850

New Elementary School - Elm Creek Public Schools
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$11,980,000 CJ est. value
Elm Creek, NE 68836

Grain Storage Bunkers
New Construction
Pending Verification
Roseland, NE

7th Street - Chestnut Avenue to Oswego Avenue - City of Hastings
Infrastructure
Conception
$390,000 CJ est. value
Hastings, NE 68901

Last Updated 02/08/2023 10:13 AM
Project Title

Lexington Self Storage - Phase 1

Physical Address View project details and contacts
City, State (County) Lexington, NE 68850   (Dawson County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,055,635 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is under construction.

Details

3 Warehouse/Storage, 27,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents