Similar Projects
Roadside Safety Improvements
Infrastructure
Design
$3,831,000 est. value
Holtville, CA

San Diego State University IV Dorms
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Calexico, CA 92231

K Street Improvements Project
Infrastructure
Bidding
$548,000 CJ est. value
Brawley, CA 92227

K Street Improvements Project
Infrastructure
Bidding
$548,000 CJ est. value
Brawley, CA 92227

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Heber Avenue Improvements
Infrastructure
Results
$953,375 est. value
Heber, CA 92249

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Rockwood Avenue Fourplex
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Calexico, CA 92231

Cole Boulevard Apartments
New Construction, Infrastructure - 52,124 SF
Pending Verification
$14,000,000 CJ est. value
Calexico, CA 92231

Heber Meadows Apartments Residential Development / El Centro
New Construction, Infrastructure
Design
$108,633,600 CJ est. value
El Centro, CA 92243

Foundation and Assembly of Greenhouse
Infrastructure
Bidding
$200,000 CJ est. value
Calexico, CA 92231

Bucklin Park Challenge Course Project
New Construction
Post-Bid
El Centro, CA 92243

Asphalt Rubber Binder Chip Seal, Pavement Markings and Shoulder Backing
Infrastructure
Results
$3,400,000 est. value
CA

Install Rumble Strips, Upgrade Guardrail, and Upgrade Facilities to Americans With Disabilities Act (ADA) Standards
Infrastructure
Design
$10,456,000 CJ est. value
Rockwood, CA 92227

Last Updated 03/23/2023 11:29 PM
Project Title

Sunbeam Lake Inclusive Playground

Physical Address View project details and contacts
City, State (County) Seeley, CA 92273   (Imperial County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $242,897 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid shall be accompanied by the bid security referred to in the contract documents and the list of proposed subcontractors in the form of a certified or cashier check or a bid bond for ten percent (10%) of the maximum bid amount being proposed. In contracts involving expenditure in excess of ten thousand dollars ($10,000), the successful bidder shall file a payment bond in a penal sum at least equal to the full contract value as awarded. The bond shall be approved by COUNTY and shall be in the form set forth in the contract documents. The successful bidder shall also file a performance bond in a penal sum at least equal to the full contract value as awarded. A performance and payment bond must be filed for contracts involving expenditure in excess of twenty-five thousand dollars ($25,000), and may be required for contracts involving smaller expenditures at the option of COUNTY. The Contractor shall possess a California Contractor's A or B License at the time this contract is awarded.COUNTY reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding. Return of Written Plans, Document Questions, and Substitution Requests December 29, 2022 at 4:00pm 1. PROTECT EXISTING UTILITY BOXES AND SPRINKLERS, RAISE, LOWER AND/OR ADJUST THESE ITEMS TO BE FLUSH WITH NEW GRADES. 2. PROTECT EXISTING TREES AS NECESSARY. 3. RE-SEED ALL GRADED AREAS (INCLUDING SWALES

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents