Similar Projects
Ballston Office Building Redevelopment
New Construction, Build-Out - 5,200 SF
Conception
Arlington, VA

Southern Sports Complex, Community Center and Pool - Fauquier County
Renovation, Alteration
Conception
$15,981,099 est. value
Warrenton, VA

Fenton Mill Development
New Construction - 40,000 SF
Design
$300,000,000 est. value
Williamsburg, VA 23188

Arbor Row A2 - Phase I
New Construction - 406,914 SF
Design
$108,000,000 est. value
Tysons, VA 22102

Swimming Pool Cleaning and Maintenance Services
Infrastructure, Alteration
Bidding
Petersburg, VA 23803

Swimming Pool Maintenance
Term Contract
Bidding
Fairfax, VA

Fair Lakes Senior Living Development
New Construction, Renovation - 250,000 SF
Post-Bid
Fairfax, VA 22033

N--Option - Pool Canopy
Post-Bid
Arlington, Fort Myer, VA 22211

White Coat/Plaster and Tile Swimming Pools
Renovation - 6,019 SF
Results
Warrenton, VA 20187

Pool Maintenance Services
Term Contract
Results
Suffolk, VA 23434

Main Street Apartment Building
New Construction - 4,000 SF
Construction
$9,443,796 est. value
Richmond, VA 23223

PPEA Aquatics Center (Hampton Virginia Aquaplex)
Construction
$29,500,000 est. value
Hampton, VA

Innovation Town Center
New Construction, Alteration
Pending Verification
Woodbridge, VA 22195

The Bingham Center
New Construction - 97,231 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Arlington, VA 22246

Old Town Pool - City of Alexandria
Alteration
Conception
$10,289,000 est. value
Alexandria, VA 22304

Last Updated 07/01/2022 12:23 PM
Project Title

Ida Lee Park Recreation Center Indoor Pool White Coating

Physical Address View project details and contacts
City, State (County) Leesburg, VA 20176   (Loudoun County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $555,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all equipment, materials, and labor for the necessary preparation and application of white plaster/whitecoat surface to the main and auxiliary indoor pools at the Ida Lee Park Recreation Center Indoor located at 60 Ida Lee Drive NW, Leesburg., VA 20176. Work includes the preparation and application of white plaster/white coat resurface of Ida Lee Recreation Center main indoor pool, with a total water surface of approximately 7,037 square feet, and auxiliary indoor pool with a total water surface of approximately 1,935 square feet. This work is inclusive of drainage of the pools, removal of debris, removing safety surface, breaking out all non-bonded whitecoat plaster, acid bath of the entire surface, applying bondcoat, application of the new marblelite surface over the pool interior surfaces, and all incidentals related thereto. The Town reserves the right to perform all, part, or none of the work.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents