Similar Projects
New Industrial Business Park
New Construction
Conception
Swanton, OH 43558

Northpoint Church Parking Lot and Auditorium Expansion
New Construction, Addition - 17,775 SF
Conception
Toledo, OH 43623

Eleanor Avenue Roadway Resurfacing and Water Main Replacement
Infrastructure
Design
$1,696,574 CJ est. value
Toledo, OH 43612

Eleanor Avenue Roadway Resurfacing and Water Main Replacement
Infrastructure
Design
$1,696,574 CJ est. value
Toledo, OH 43612

Boss Park Playground Replacement and Site Improvements
Infrastructure
Bidding
$220,000 CJ est. value
Toledo, OH 43604

New Construction of YMCA Community Hub and Adjacent Park
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Toledo, OH 43620

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Otsego Road River Access
Infrastructure
Post-Bid
Less than $288,902 est. value
Maumee, OH

2020 County Street Cuts
Results
Toledo, OH

2021 Road Improvements
Results
$627,700 est. value
Ottawa Hills, OH 43606

Construction Management at Risk Services RFQ - Parking Lot Project 2021
Construction
$8,000,000 est. value
Toledo, OH 43609

Street Resurfacing and Reconstruction - Toledo
Infrastructure
Pending Verification
$5,440,000 CJ est. value
Toledo, OH 43604

Street Resurfacing and Reconstruction - Toledo
Infrastructure
Pending Verification
$5,440,000 CJ est. value
Toledo, OH 43604

Executive Parkway Restaurant
New Construction, Infrastructure
Conception
$1,000,000 est. value
Toledo, OH 43606

AutoZone #6876 / Waterville
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Waterville, OH 43566

Last Updated 09/27/2022 02:11 PM
Project Title

Universal Metals Expansion

Physical Address View project details and contacts
City, State (County) Toledo, OH 43611   (Lucas County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $40,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 27, 2022 the project is in planning stage. Information regarding municipal approvals, the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the spring of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 75,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents