Similar Projects
New School At Maple Point Campus
New Construction
Conception
Langhorne, Neshaminy, PA 19047

Major Renovations At Austin Meehan Middle School - 8140 - School District Of Philadelphia
Renovation
Conception
$12,848,988 est. value
Philadelphia, PA 19152

Clifton Heights Middle School
New Construction
Design
$65,000,000 est. value
Clifton Heights, PA 19018

New Athletic Stadium
New Construction
Design
Center Valley, PA 18034

Fuel Storage and Dispensing Project
New Construction, Infrastructure
Bidding
$114,600 CJ est. value
Edinboro, PA 16412

Alterations to Network Distribution Frames and Structured Cabling at Valley Forge Middle School and Tredyffrin/Easttown Middle School
Renovation
Bidding
$700,000 CJ est. value
Wayne, PA 19087

Haverford High School Project 2 - General Construction
New Construction, Renovation, Addition - 19,850 SF
Post-Bid
$8,842,000 est. value
Havertown, PA 19083

State Road - Unit Ventilator Renovations
Renovation
Post-Bid
West Grove, PA 19390

Auditorium Renovation - General Construction
Renovation
Results
$1,250,000 est. value
Tyrone, PA 16686

Design, Bid and Construction Oversight of Renovation to Knoch High School
Renovation - 170,500 SF
Results
$20,000,000 to $25,000,000 est. value
Saxonburg, PA 16056

Saint Patrick's Parish Lower School Addition
Addition - 5,067 SF
Construction
$500,000 est. value
Malvern, PA 19355

The Gene Deal Fields
Renovation
Construction
$2,100,000 est. value
Fox Chapel, Pittsburgh, PA 15238

Vic Maggitti Pavilion at Malvern Preparatory School
New Construction, Renovation, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Malvern, PA 19355

Saints Peter and Paul Event Center / Pittsburgh
Demolition, Infrastructure, Renovation
Pending Verification
$15,000,000 CJ est. value
Pittsburgh, PA 15206

Beaver Area School District High School - Middle School Natatorium Renovation - Pennsylvania Office of the Budget
Demolition, New Construction, Infrastructure
Conception
$2,484,400 CJ est. value
Beaver, PA 15009

Last Updated 04/14/2023 10:32 AM
Project Title

Girard High School And Elk Valley Elementary School Secure Entry

Physical Address View project details and contacts
City, State (County) Girard, PA 16417   (Erie County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $333,950 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 14,2023, project has been awarded: General Construction - E.E. Austin in the amount of $281,000.00 Electrical work - Newco Electrical in the amount of $52,950.00 This specification includes all labor, supervision, equipment, tools, material, transportation and all means of construction necessary to complete all work shown on the drawings and specified in this division and as shown on the drawings and/or as described in this specification, or as is necessary to complete the project in a first-class manner. Provide also all equipment, shoring, pumping, barricades, night lights and all else necessary or required by the Architect and OSHA. Under this heading is all demolition necessary or shown on the drawings and/or specified herein. Also, under this division is the restoration of the site for any damage to it as a result of this contract. Interior Work 1. Remove all surface materials and equipment on walls and ceilings which will interfere with new work. Hand over to Owner for storage during construction. Owner will turn back over to Contractors as requested for reinstallation by Contractors prior to completion of project. 2. Remove existing equipment and relocate only the items as indicated on the drawings. 3. Removal of existing floor finishes as indicated on the drawings, prep and level as required. 4. All demolition listed in the legend on the drawings and any other demolition, which might be required to perform all renovations and to construct all additions for the project are hereby included by the proper competent trades. Opinion of Estimated Cost General Construction $ 265,000.00 Electrical Construction $ 15,000.00 For General and Electrical Construction Work for Girard High School The Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. No bid shall be withdrawn for a period of sixty (60) days, subsequent to the opening of bids, without the consent of the Girard School District. THE SCHOOL DISTRICT IS AN EQUAL OPPORTUNITY AGENCY Bid Result GENERAL CONTRACTOR EE Austin 317,000 ELECTRICAL CONTRACTOR Newco Electric 54,800

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents