Similar Projects
Van Nuys and Voss Mixed Use Development
New Construction, Infrastructure, Alteration - 86,550 SF
Design
Los Angeles, CA 91405

Design Build - Construct Parking South East Campus
Alteration
Design
$2,000,000 to $5,000,000 est. value
Mather, Rancho Cordova, CA 95655

Master As-Needed Agreement M14 Curb Ramp Construction
Infrastructure
Bidding
$1,000,000 est. value
San Francisco, CA

PW Potrero Gateway Streetscape Improvements
Infrastructure
Bidding
$1,800,000 est. value
San Francisco, CA 94158

De Anza Park Pathway Renovation
Infrastructure
Post-Bid
$546,000 est. value
Sunnyvale, CA 94087

2021 Pavement Rehabilitation
Alteration
Post-Bid
$500,000 est. value
Ross, CA 94957

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Marin County Jail Booking Area Barrier Removal for ADA Compliance
Infrastructure
Results
$159,249 est. value
San Rafael, CA 94903

Construct New Parking Lot
Alteration
Design
$500,000 to $1,000,000 est. value
Dublin, CA 94568

Outdoor Improvements at Four Sites
Infrastructure, Alteration
Bidding
Pacifica, CA 94044

Parking Pay Station Site Improvements Lot J
Infrastructure
Post-Bid
$20,000 est. value
Rohnert Park, CA 94928

Fancher Creek Trail
Infrastructure
Results
$669,877 est. value
CA

Repair Concrete Sidewalk & Replace Fire Hydrant
Alteration
Design
$100,000 to $250,000 est. value
Long Beach, CA 90822

2022 Parking Lot Seal Coat
Infrastructure
Bidding
$68,000 est. value
Morgan Hill, CA 95037

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

Last Updated 02/28/2022 06:22 AM
Project Title

FY22 New Sidewalks Project - Hesperian Boulevard and West Winton Avenue

Physical Address View project details and contacts
City, State (County) Hayward, CA 94545   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $910,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists, in general, of demolition of existing improvements, saw cutting, , construction of concrete sidewalk, curb & gutter, curb ramps driveway approaches, tree removal and installation and performing other items

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents