Similar Projects
Pipestem Dam Spillway Modifications
Renovation, Term Contract
Post-Bid
$100,000,000 to $250,000,000 est. value
Jamestown, ND 58401

Construction of NAWS South Prairie Reservoir and Control Structure-General Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Construction of NAWS South Prairie Reservoir and Control Structure - Combined General, Mechanical, Electrical and Reservoir Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Red River Structure - FMM Area Flood Risk Management
Bidding
$100,000,000 to $250,000,000 est. value
Fargo, ND

Construction of NAWS South Prairie Reservoir and Control Structure - Combined General, Mechanical and Electrical Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Jamestown Dam Outlet Works Stilling Basin Concrete Floor Repairs
Design
$500,000 to $1,000,000 est. value
Jamestown, ND

P--Bone Hill NWR - Dam Breach Construction
Renovation
Results
ND

McDowell Dam Bank Stabilization 2021
Results
$106,000 est. value
Bismarck, ND

Last Updated 11/23/2021 04:23 PM
Project Title

Construction of NAWS South Prairie Reservoir and Control Structure - 10.5 MG Wire-Wound Reservoir Construction

Physical Address View project details and contacts
City, State (County) Bismarck, ND   (Burleigh County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $14,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction work includes: Construction of new 10.5 MG Wire-Wound, AWWA D110, Type III Reservoir, excavation and backfill for construction of reservoir, interior and overflow piping within reservoir, metalwork, hatches, coatings; and other miscellaneous Work. Responsibilities also include construction of the primary access road into the Reservoir/Flow Control Structure site, and conveyance of water to fill the Reservoir and approximately 15 miles of 36-inch pipe

Details

Dam/Tunnel, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents