Similar Projects
Central HS Combes Gym
Renovation
Bidding
Champaign, IL 61820

2021 General Remodeling at Lockport Township High School
Renovation
Bidding
Lockport, IL 60441

New Innovative Center & School Renovations
Renovation
Post-Bid
Carol Stream, IL 60188

ICR Wendell Phillips Academy HS
Post-Bid
Chicago, IL 60653

Oak Park & River Forest HS South Cafeteria Phase I
Renovation
Results
Oak Park, IL 60302

Orozco School Environmental Abatement
Renovation
Results
Chicago, IL 60608

Capital Improvements Phase 1 - Sequence 2.2
Renovation
Bidding
Hillside, Maywood, IL 60153

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Disney II Magnet HS Convent Building Tuckpointing
Results
Chicago, IL 60602

CPS Pre K Package 11
Renovation
Bidding
Chicago, IL 60621

Fitness Addition - East Building Addition Phase II
Addition - 89,000 SF
Post-Bid
Lincolnshire, IL 60069

Gym 1 Renovations and Think Lab at Lane Tech HS
Renovation
Results
Chicago, IL 60618

Robinson Health-Life Safety Improvements
Renovation
Bidding
Robinson, IL 62454

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

ICR - Ceiling Replacement at Roberto Clemente Community Academy High School
Results
Chicago, IL 60622

Last Updated 01/26/2021 05:11 PM
Project Title

Gymnasium Renovations - Phase Two

Physical Address View project details and contacts
City, State (County) Elgin, IL 60120   (Kane County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes but is not limited to: The sanding, refnishing and restriping of the existing wood door, as well as new bleachers, new basket- ball backstops, new gym divider curtain, new drinking fountains, and new gymnasium equipment at the Main Gymnasium at Larsen Middle School. All demolition, architectural, mechanical, electrical, and plumbing work will be the responsibility of the general/prime contractor.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Athletic Equipment, Gymnasium Equipment.
Division 12 - Furnishings, Telescoping Stands, Telescoping Bleachers.
Division 22 - Plumbing.
Division 26 - Electrical, Lighting.
Division 27 - Communications, Common Work Results for Communications, Communications Horizontal Cabling.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, Fire Detection and Alarm, Digital, Addressable Fire-Alarm Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents