Last Updated | 01/26/2023 02:09 PM |
Project Title | Floyd County Board of Education - Bus Garage - Phase 3 |
Physical Address | View project details and contacts |
City, State (County) | Martin, KY 41649 (Floyd County) |
Category(s) | Commercial, Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Gas Station, Middle/Senior High School, Site Development, Vehicle Sales/Service |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $450,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Description: The Floyd Co. Bus Garage - Phase 3 project will be for site development, interior finishes, and MEP equipment. There is no Pre-Bid Meeting scheduled. However, it is strongly encouraged that all potential bidders visit the property to examine the site. The existing property is located at 1061 KY-122; Martin, KY 41649. Bid Guarantee: A 5% bid bond or certified check equal to 5% of the bid, including all alternates, is required to be submitted with the official form of proposal. A 100% payment and performance bond shall be provided for the full base bid amount plus any accepted bid alternate(s), upon receipt of a Notice of Award. Kentucky State Sales Tax: The owner intends to purchase major materials for the project through purchase orders managed by the Construction Manager, which are also referred to as Direct Purchase Orders. Materials must be $5,000 or greater in value in order to be listed and considered as Direct Purchase Order item. All material cost(s) intended to be used as an Owner Direct Purchase Order shall be included in the bid amount excluding tax. Any material purchased by the contractor and paid for by the contractor shall have sales tax paid for by the contractor. Any unused amounts included within a purchase shall be retained by the Floyd County Board of Education METHOD OF BIDDING: Bids will be received from Individual Trade Package Contractors on a Lump Sum Bid Basis for the Individual Trade Bid Package as described herein. All phases of the work described and outlined within the Individual Trade Bid Packages will be completed by the successful Individual Trade Bid Package Contractor. Bids shall be submitted in the manner herein described and on the official proposal form included with the general conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. Kentucky Prevailing Wage Rates do not apply. METHOD OF AWARD: Award shall be issued on the lowest responsive bid by a responsible bidder meeting all requirements of this solicitation and as required by the specifications. BID WITHDRAWAL: No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum bid shall not be cause for withdrawal of bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids. Individual Trade Bid Packages Listing: The following Individual Bid Packages will be accepted: BID PACKAGE NO. 04 GENERAL TRADES BID PACKAGE NO. 05 FINISHES BID PACKAGE NO. 06 MECHANICAL BID PACKAGE NO. 07 ELECTRICAL The Floyd County Board of Education reserves the right to accept and/or reject any bid deemed to be in the best interest of the Floyd County Board of Education in accordance with the laws of the Commonwealth of Kentucky and the Kentucky Department of Education. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |