Similar Projects
Saint Timothy Catholic School Gym and Classroom Addition - Phase 3
New Construction, Addition - 32,349 SF
Conception
Union, KY 41091

Old Schoolhouse Lane Subdivision
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Lexington, KY 40513

Welding Alloys Storage Building
New Construction, Infrastructure - 16,000 SF
Design
$1,700,000 CJ est. value
Florence, KY 41042

Eastside & Southside Technical Centers - Fayette County Board of Education
Renovation, Infrastructure - 68,114 SF
Design
$9,905,555 CJ est. value
Lexington, KY 40508

Shillito and Southland Parks Parking Lot Renovation
Infrastructure
Bidding
$400,000 CJ est. value
Lexington, KY 40503

Infrastructure Construction - Fuel Card Reader System
Infrastructure
Bidding
$230,000 CJ est. value
Paris, KY 40361

Calloway County High School Auxiliary Gymnasium
New Construction
Post-Bid
Murray, KY 42071

Jones Middle School
Renovation, Addition
Post-Bid
$6,500,000 est. value
Florence, KY 41042

Baseball Field Backstop Safety System
Results
Union, KY 41091

New Middle School at Polo Club Boulevard
New Construction, Infrastructure - 170,893 SF
Results
$68,500,000 CJ est. value
Lexington, KY 40509

Johnson Elementary School
Construction
Less than $19,335,000 est. value
Fort Thomas, KY

2019 Water System Improvements Contract 12 - New Water Treatment Plant and Improvements
New Construction, Infrastructure
Construction
$1,180,000 CJ est. value
Sandy Hook, KY 41171

Blackburn Avenue Multi-Residential Development
New Construction, Infrastructure - 24,816 SF
Pending Verification
$6,000,000 CJ est. value
Lexington, KY 40508

Renaissance on Broadway
New Construction, Infrastructure - 20,000 SF
Pending Verification
$20,000,000 CJ est. value
Louisville, KY 40211

Address Pavement Condition of Edward T. Breathitt Pennyrile Parkway Both Direction(S)
Infrastructure
Conception
$1,750,000 CJ est. value
Hopkinsville, KY 42240

Last Updated 01/26/2023 02:09 PM
Project Title

Floyd County Board of Education - Bus Garage - Phase 3

Physical Address View project details and contacts
City, State (County) Martin, KY 41649   (Floyd County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) Elementary School, Gas Station, Middle/Senior High School, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: The Floyd Co. Bus Garage - Phase 3 project will be for site development, interior finishes, and MEP equipment. There is no Pre-Bid Meeting scheduled. However, it is strongly encouraged that all potential bidders visit the property to examine the site. The existing property is located at 1061 KY-122; Martin, KY 41649. Bid Guarantee: A 5% bid bond or certified check equal to 5% of the bid, including all alternates, is required to be submitted with the official form of proposal. A 100% payment and performance bond shall be provided for the full base bid amount plus any accepted bid alternate(s), upon receipt of a Notice of Award. Kentucky State Sales Tax: The owner intends to purchase major materials for the project through purchase orders managed by the Construction Manager, which are also referred to as Direct Purchase Orders. Materials must be $5,000 or greater in value in order to be listed and considered as Direct Purchase Order item. All material cost(s) intended to be used as an Owner Direct Purchase Order shall be included in the bid amount excluding tax. Any material purchased by the contractor and paid for by the contractor shall have sales tax paid for by the contractor. Any unused amounts included within a purchase shall be retained by the Floyd County Board of Education METHOD OF BIDDING: Bids will be received from Individual Trade Package Contractors on a Lump Sum Bid Basis for the Individual Trade Bid Package as described herein. All phases of the work described and outlined within the Individual Trade Bid Packages will be completed by the successful Individual Trade Bid Package Contractor. Bids shall be submitted in the manner herein described and on the official proposal form included with the general conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. Kentucky Prevailing Wage Rates do not apply. METHOD OF AWARD: Award shall be issued on the lowest responsive bid by a responsible bidder meeting all requirements of this solicitation and as required by the specifications. BID WITHDRAWAL: No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum bid shall not be cause for withdrawal of bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids. Individual Trade Bid Packages Listing: The following Individual Bid Packages will be accepted: BID PACKAGE NO. 04 GENERAL TRADES BID PACKAGE NO. 05 FINISHES BID PACKAGE NO. 06 MECHANICAL BID PACKAGE NO. 07 ELECTRICAL The Floyd County Board of Education reserves the right to accept and/or reject any bid deemed to be in the best interest of the Floyd County Board of Education in accordance with the laws of the Commonwealth of Kentucky and the Kentucky Department of Education.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents