Similar Projects
Last Updated | 08/22/2019 10:41 AM |
Project Title | Carriage Trail Drive Ditching and Culvert Replacement |
Physical Address | View project details and contacts |
City, State (County) | Farmingdale, ME (Kennebec County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The first 133 feet of shoulder to box #12 is washed out, from box #12 to 24 is 215 feet that needs to be shouldered and ditched. At box #24 culvert needs to be replaced, from box 24 to box 30 is 186 feet that will need to be ditched. From box 30 to box 44, are 206 feet which need to be ditched and culvert flushed from box 44 to box 58. The first driveway culvert is 160 feet needs to be ditched. Around box 58 where water discharges, needs to be cleaned up. There are trees stopping the water run off. Box 58 has a second culvert and there is 89 feet between the two and the ditch needs to be cleaned up from the second culvert to box 68 that is approximately 94 feet. This also needs to be cleaned on the opposite end of box 68. There are 31 feet of culvert and it needs to be flushed and entry way of pipe needs to be cleaned. | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |