Similar Projects
Brightwater Aeration Basin Optimization
Infrastructure
Design
$5,500,000 est. value
WA

Lake Hills and NW Lake Sammamish Interceptor Upgrade
Infrastructure
Design
$70,000,000 est. value
WA

Wetland Delineation and Biological Survey For a Proposed New Well and Water Main
Infrastructure
Bidding
$110,000 est. value
Oakville, WA

Lower Satsop Right Bank Conservation
Infrastructure
Post-Bid
Montesano, WA

Coon Creek Fish Passage Barrier Removal Project
Alteration
Post-Bid
Granite Falls, Snohomish, WA 98252

Nason Creek Kahler Reach Habitat Enhancement Project
Infrastructure
Results
$718,000 to $794,000 est. value
Wenatchee, WA 98801

Little Squalicum Estuary En052
Term Contract
Results
$3,000,000 to $3,200,000 est. value
Bellingham, WA

The Firs At Talus
New Construction, Infrastructure
Construction
Issaquah, WA 98027

Herzman Levee Setback Construction
Infrastructure
Design
$4,200,000 est. value
WA

Fall City Floodplain Restoration Project
Infrastructure
Post-Bid
$9,715,074 est. value
Fall City, WA 98024

South Renton Transit Center Remediation Project
Infrastructure
Results
$3,300,000 est. value
Renton, WA 98057

Mitigation Fairwood - 4 Phase - 2 Molasses Creek
Infrastructure
Design
WA

Sammamish River Cis
Alteration
Post-Bid
$1,200,000 est. value
WA

Padden Creek Improvements 24Th To 30Th Streets En055
Alteration
Results
Bellingham, WA

Lake Hills Interceptor Phase II
Alteration
Design
$13,330,000 est. value
WA

Last Updated 07/14/2022 08:32 AM
Project Title

Quillayute River Restoration

Physical Address View project details and contacts
City, State (County) State-Wide: WA
Category(s) Environmental
Sub-Category(s) Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed contract work includes acquisition and delivery of appropriate materials and construction services to complete the restoration design, including floodplain side channel excavation, construction and installation of large wood structures, Tribal fishing access enhancements, and Thunder Road parking area improvements.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 32 - Exterior Improvements, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents