Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Bayfield Waterfront Walk Improvement
Infrastructure
Bidding
Bayfield, WI

Site Utility Distribution System Replacement - Phase II GPC
Infrastructure
Bidding
$2,000,000 est. value
Menomonie, WI 54751

Sidewalk and Curb Replacement
Post-Bid
$5,000 est. value
Winter, WI 54896

Torch Lake Campground Improvements - Phase 3
Post-Bid
Conover, WI

Motor Vehicles Storage Compound Expansion
Results
$700,000 est. value
Mosinee, WI 54455

Field House Renovations Rec Sites - Clovernook, Columbia, Custer, Franklin and Southlawn
Renovation
Results
Milwaukee, WI 53223

Limestone Ridge Outdoor Pool
New Construction - 4,384 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fitchburg, WI 53719

Towers Parking Lot Reconstruction - MEP
Infrastructure
Bidding
$1,000,000 est. value
Eau Claire, WI 54701

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

Parking Lot
Results
Milwaukee, WI 53205

Towers Parking Lot Reconstruction - GPC
Infrastructure
Bidding
$1,000,000 est. value
Eau Claire, WI 54701

Burnham Pointe Park
Post-Bid
Less than $231,532 est. value
West Allis, WI

East 9th Street - Street and Utility Improvements
Results
Owen, WI 54460

Repair Trail and Bridge Washouts
New Construction, Infrastructure
Bidding
$925,000 est. value
Mason, WI 54856

Last Updated 02/09/2022 02:07 PM
Project Title

Bloomfield Mckay Park Pavilion and Parking Lot

Physical Address View project details and contacts
City, State (County) WI   (Walworth County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of one 20’x56’ concrete pad with footings and plumbing rough in for sewer and water a sanitary sewer lateral, and grading of the surrounding area, as well as increasing the existing gravel parking area. Preparation of the foundation includes removal of minimum 5-foot depth and backfilling with clean and suitable material. Total grading of the area requires approximately 520 CY of excavation and 830 CY of fill for the concrete pad and gravel parking. These improvements include removal of existing overhead lines and utility poles, site dewatering, excavation common, landscape restoration, and erosion control. In addition, bids will be requested for construction of the pavilion, with the material list provided by Menards Midwest Manufacturing, connection of the sanitary sewer including pump, and watermain service connection. Lighting and power will also be included as part of the additional bid.

Details

Misc. Recreational, New Construction.
Division 13 - Special Construction.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents