Similar Projects
Pronto Freight Ways - Addition
Addition - 16,500 SF
Conception
Taylor, MI 48180

Mastronardi Produce - Addition
Addition - 85,000 SF
Conception
$8,600,000 est. value
Livonia, MI 48150

Insite Logistics Facility - Project Viper
New Construction - 138,435 SF
Design
$10,000,000 CJ est. value
Romulus, MI 48174

Kroger Fullfilment Center
New Construction - 130,000 SF
Design
Romulus, MI

Magna International - Expansion and Renovation
Addition - 5,000 SF
Post-Bid
$35,000,000 est. value
Highland Park, MI 48203

Public Storage
New Construction
Post-Bid
Trenton, MI 48183

Department of Public Works Water and Sewer Garage
New Construction - 3,200 SF
Results
Grosse Pointe Woods, MI 48236

Construction Contract for the Customs and Border Protection Seized Cargo Facility
New Construction, Renovation
Results
$1,000,000 to $5,000,000 est. value
Detroit, MI 48216

Conners Creek Plant
Demolition
Construction
Detroit, MI

Detroit-Hamtramck - Factory Zero
Renovation
Construction
$2,200,000,000 est. value
Detroit, MI

Detroit Manufacturing Systems - Expansion Project
Renovation - 542,000 SF
Pending Verification
$31,900,000 est. value
Detroit, MI 48223

Grobbels Cold Storage
New Construction, Addition - 150,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Detroit, MI 48269

The Parade Company - New Location
Renovation, Addition, Demolition - 130,300 SF
Conception
$30,500,000 est. value
Detroit, MI 48214

Storage Shed at Fire Station 2
New Construction
Post-Bid
Dearborn, MI 48124

Detroit River IWR Storage Building
New Construction
Results
$100,000 to $250,000 est. value
Trenton, MI

Last Updated 10/19/2021 09:54 AM
Project Title

Conner Street Warehouse Development - Speculative

Physical Address View project details and contacts
City, State (County) Detroit, MI 48213   (Wayne County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Warehouse/Storage
Contracting Method Owner to Subcontract.
Project Status Construction Commenced, Sitework Commenced March 2021, Construction Completion Expected October 2022
Bids Due View project details and contacts
Estimated Value $47,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1,598,000 SF - Warehouse/Storage, 682,000 SF New Construction, Manufacturing/Processing Plant, 3 Stories Above Grade, 916,000 SF Demolition, 18 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents