Similar Projects
New Library and Events Center
Design
$21,000,000 est. value
Winter Park, FL 32980

Newfield - Master Plan
New Construction - 296,000 SF
Design
$10,000,000 CJ est. value
Palm City, FL 34990

Veteran's Memorial Library and Women's Club Building Remodel
Renovation - 4,089 SF
Post-Bid
Less than $286,000 est. value
Saint Cloud, FL 34769

Design-Build Services for Vertical/Architectural Design-Build Projects
New Construction, Renovation
Post-Bid
Jacksonville, FL

Charles Webb Wesconnett and Highlands Regional Libraries Children's Area Renovations-PQ-Vertical
Renovation
Results
Less than $1,172,800 est. value
Jacksonville, FL 32210

Design-Build Renovation Services for Minneola Library
Renovation - 5,200 SF
Results
Less than $500,000 est. value
Minneola, FL 34755

Hugh Embry Library Renovation
Renovation
Construction
Dade City, FL 33523

Wellington Library Renovation and Chiller Replacement CM
Renovation
Construction
$1,900,000 est. value
FL

Hudson Library Renovation
Renovation - 32,640 SF
Design
Hudson, FL

South County Regional Library Renovation - Construction Manager at Risk
Renovation
Post-Bid
Estero, FL 33928

Pace Library Expansion
Addition - 1,500 SF
Results
Milton, FL 32571

Lantana Library Renovation
Renovation
Construction
$1,600,000 est. value
Lantana, FL

Library Entry Design Build
Results
Bradenton Beach, FL 34217

Bellview Library Conversion
Renovation, Addition - 12,500 SF
Construction
Less than $3,900,000 est. value
Pensacola, FL 32526

Construction Management Services for the City of New Port Richey Public Library Interior Renovation
Renovation
Results
Less than $1,800,000 est. value
New Port Richey, FL 34652

Reported 10/19/2021 10:01 AM
Project Title

President Barack Obama Main Library Renovations

Physical Address View project details and contacts
City, State (County) Saint Petersburg, FL 33713   (Pinellas County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method
Project Status Construction Commenced second quarter 2021
Bids Due View project details and contacts
Estimated Value $6,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Direction: Primary interface with the selected firm will be the City's Design Manager of the Engineering and Capital Improvements Department. The Design Manager will be responsible for the direction, review, and approval of all work as well as the program administration of the contract for compliance with and interpretation of scope, schedule, and budget. In carrying out these functions, the Design Manager will utilize the various departments and personnel of the City of St. Petersburg and coordinate with other governmental agencies as required to ensure a successful project.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents