Similar Projects
Armor Joint Repairs and Joint Sealing on Various Roads and Bridges, Precinct 3
Results
Houston, TX

Driveway Resurface Project
Results
$100,000 to $250,000 est. value
Denton, TX 76209

Blanco Road Phase II
Results
$19,200,000 est. value
San Antonio, TX 78207

2019-2020 Microsurface Toc Package 1
Results
$3,000,000 est. value
San Antonio, TX

Harvest Townside Phase 2 Paving
Results
TX

Harvest Townside Phase 2 Mass Grading
Results
TX

Southern Region Disaster Recovery Support BPA
Results

Reported 11/26/2019 12:00 AM
Project Title

North Hackberry Avenue Mill and Overlay

Physical Address View project details and contacts
City, State (County) Luling, TX 78648   (Caldwell County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from Municipal Agency - 11/05/19
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of milling to a depth of 2-inches and overlaying the milled areas with 2- inches of HMAC from Pierce Street (US 90) to San Marcos Highway (TX 80) and re-striping. Project includes full depth pavement repair using 8-inches of black base for designated areas. Alternates for areas of East Austin and West Davis Streets are also included.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents