Similar Projects
Olive Crossing Mixed Use Development
New Construction - 253,133 SF
Conception
$10,000,000 CJ est. value
Olivette, MO 63132

Hampton Manor of O'Fallon Assisted Living
New Construction - 71,291 SF
Conception
$14,000,000 est. value
O'Fallon, MO 63366

Whataburger
New Construction, Demolition
Design
Blue Springs, MO 64015

Starbucks Coffee Shell Building
New Construction - 2,140 SF
Bidding
$500,000 to $1,000,000 CJ est. value
Branson, MO

Sonic Drive-In Restaurant
New Construction - 1,403 SF
Bidding
Less than $500,000 CJ est. value
Ozark, MO 65721

Firestone Complete Auto Care
New Construction - 6,262 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Springfield, MO 65810

Starbucks
New Construction - 2,198 SF
Post-Bid
Lees Summit, MO 64081

Starbucks
Build-Out - 2,198 SF
Construction
$200,000 to $225,000 est. value
Kansas City, MO 64157

Pioneer Plaza Price Chopper Grocery Store
New Construction - 49,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Kansas City, MO 64134

Take 5 Oil Change
New Construction
Pending Verification
Blue Springs, MO 64015

Starbucks
Renovation - 2,198 SF
Post-Bid
Lees Summit, MO 64081

AC Rialto by Marriott
Renovation - 169,000 SF
Pending Verification
$65,700,000 est. value
Kansas City, MO 64106

Olive Garden #1056
Renovation - 9,085 SF
Post-Bid
Independence, MO 64055

Fast Food Restaurant
Build-Out
Pending Verification
Eureka, MO 63025

Carmax Auto Superstore #6152
New Construction - 7,700 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Springfield, MO 65809

Last Updated 07/08/2021 02:11 PM
Project Title

Mobil On The Run

Physical Address View project details and contacts
City, State (County) O Fallon, MO   (Saint Charles County)
Category(s) Commercial
Sub-Category(s) Car Wash, Food/Beverage Service, Gas Station, Vehicle Sales/Service
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Car Wash, New Construction, Gas Station, New Construction, Food/Beverage Service, New Construction, 1 Vehicle Sales/Service, 1 Story Above Grade, 6,000 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Office Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Interior Planters and Artificial Plants, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents