Similar Projects
Construction Managers at Risk to Replace Randolph Hall at Virginia Tech
New Construction - 284,000 SF
Bidding
$170,000,000 est. value
Blacksburg, VA

On Demand Construction and Skilled Trades Services
Renovation
Bidding
$500,000 est. value

Student Wellness Improvements Project
Post-Bid
Blacksburg, VA

Undergraduate Lab Building
Post-Bid
Blacksburg, VA

Graduate Housing Stairwell Repairs
Results
Williamsburg, VA 23185

Construct Memorial to the Enslaved
Results
Williamsburg, VA 23187

Virginia Military Institute Preston Library Renovation
Renovation - 90,000 SF
Construction
$19,200,000 est. value
Lexington, VA 54046

Uva Memorial Gym Facade Repair
Renovation
Bidding
Charlottesville, VA

Grant House 1st and 3rd Floor Renovation
Renovation
Post-Bid
Richmond, VA 23284

Starbucks at Chartway Arena Renovation
Renovation - 1,672 SF
Results
$244,400 to $450,000 est. value
Norfolk, VA

Hermes A. Kontos Medical Sciences Building; Mezzanine Level Alterations
Renovation
Post-Bid
Richmond, VA

Gornto Hall Elevator Modernization
Results
Less than $194,394 est. value
Norfolk, VA 23529

Robert Blackwell Smith Building; Alterations to Labs 522, 524and 526
Renovation
Post-Bid
Richmond, VA

Brooks Library First Floor Renovations
Renovation
Results
$248,975 est. value
Norfolk, VA

Vernon Smith Hall 1st Floor Lease Renovations
Renovation - 13,000 SF
Results
$60,695 est. value
Arlington, Fairfax, VA 22201

Last Updated 05/05/2020 09:02 AM
Project Title

Law School Withers Brown Kitchenette WB398 Renovation

Physical Address View project details and contacts
City, State (County) Charlottesville, VA 22904   (Albemarle County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the following, but is not limited to supplying the labor, material, coordination, and supervision to renovate the kitchenette area in Staff Lounge WB398, including the installation of kitchen appliances and furniture and all related work.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents