Similar Projects
Store-It Right Storage Facility / Pabst Farms Commerce Center
New Construction, Infrastructure - 122,000 SF
Design
$13,000,000 CJ est. value
Oconomowoc, WI 53066

Maple Centre - Phase 2
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Mukwonago, WI 53149

Bike Path
Term Contract
Post-Bid
Brookfield, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Water Hydrant
Infrastructure
Results
North Prairie, WI 53153

National Heritage Academies / Waukesha
New Construction, Infrastructure - 45,000 SF
Construction
$9,500,000 CJ est. value
Waukesha, WI 53189

ABB Inc. Headquarters
New Construction, Infrastructure - 301,320 SF
Construction
$161,000,000 CJ est. value
New Berlin, WI 53146

Atlas Metals Parts Co Expansion
Addition, New Construction, Infrastructure - 4,900 SF
Pending Verification
$260,000 CJ est. value
Waukesha, WI 53186

Brookfield Square Mall
Demolition, New Construction, Infrastructure - 370,000 SF
Pending Verification
$81,000,000 CJ est. value
Brookfield, WI 53005

Maple Centre - Phase 1
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Mukwonago, WI 53149

2023 Road Program: Utility Repairs And Roadway Resurfacing Professional Services
Infrastructure
Post-Bid
Sussex, WI

Pewaukee-Brookfield Multi-use Path
Renovation, Infrastructure
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Tower Ridge Apartments
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Oconomowoc, WI 53066

Last Updated 05/05/2023 12:12 PM
Project Title

2022 Road Program, Contract 1-2022

Physical Address View project details and contacts
City, State (County) Brookfield, WI 53005   (Waukesha County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2022
Bids Due View project details and contacts
Estimated Value $418,839 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Paving - Concrete, Street/Road Concrete Repair, Construction, Street/Road Asphalt Resurfacing and Milling, Concrete Pavement, Sawcutting/Sidewalk/Pavement, Grade and Surface, Pavement Removal, Asphalt Pulverizing, Excavation, Street/Road Materials, Erosion Control - Temporary, Stormwater Improvements, Paving (Asphalt or Concrete), Street/Road Intersection Improvements, Materials, Equipment and Supplies, Street/Road Intersection Construction and Repair, Street/Roadway Reconstruction , Asphalt Overlay, Utility Street Construction and Excavation, Sitework/Excavating and Grading, Street/Road Repairs, Concrete Pavement Removal, Street/Road Concrete Reconstruction. The Project includes the following Work: Pulverization and overlay of Hillcrest Drive, Valley Road, Cherokee Drive, and approximately 440 lineal feet of Ridge Road including asphalt and concrete driveway apron replacement. Additional work will include approximately 690 lineal feet of storm sewer removal and storm sewer installation on Valley Road. This is a Town Local Road Improvement Project (LRIP). The Town of Brookfield reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. The Strand Associates, Inc.(R) project manager is Justin J. Gutoski, P.E., and can be contacted at Strand Associates, Inc.(R), 910 West Wingra Drive, Madison, WI 53715, (608) 251 4843, regarding the project. For further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents