Similar Projects
Exton Library Front Parking Lot Modification
Infrastructure
Post-Bid
Exton, PA 19341

Ramp, Railing and Stairs for Bandshell at Reeves Park
Alteration
Post-Bid
Phoenixville, PA

ADA Improvements - Bob White and Swedeland Parks
Results
King of Prussia, Wayne, PA 19087

Construction of Stone Parking Lot
Results
Kemblesville, PA 19347

Transit Center Access Improvements Project
Infrastructure
Post-Bid
$1,000,000 to $1,200,000 est. value
Oxford, PA

ADA Ramps 2020 Chester and Mont Co
Results
$2,500,000 to $4,999,999 est. value

Morris Road Improvements - Cedarbrook Avenue to South Devon Avenue
Results
Wayne, PA 19087

PA 23 Sidewalk Improvement Project
Results
$250,000 to $500,000 est. value
Kimberton, PA 19442

Paoli Pike Trail Segment A
Results
$200,000 to $499,999 est. value
PA

Replace Roll Curb
Results
Downingtown, PA

2021 Curb, Sidewalk, and Street Project
Results
Honey Brook, PA

State Road Sidewalks
Infrastructure
Results
$1,000,000 to $2,499,999 est. value
PA

Hankin Library Parking Lot and Sidewalk Repaving
Infrastructure
Results
$113,955 est. value
Chester Springs, PA 19425

Walnut Lane Park - Phase Two Project
Infrastructure
Results
Chester Springs, PA 19425

Community Park Restroom Ramp Improvement
Infrastructure
Results
$25,000 to $27,500 est. value
West Grove, PA

Reported 02/25/2022 12:00 AM
Project Title

Crosswalk Replacement Project

Physical Address View project details and contacts
City, State (County) West Chester, PA 19383   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract involves, but is not limited to: Removal of and in-kind replacement of four (4) existing decorative thermoplastic stamped asphalt crosswalks, pavement removal and new pavement placement, with the replacement of two (2) detectable warning surfaces (DWS), some minor concrete removal and replacement on the existing ADA ramps and the traffic control required to perform construction.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents