Similar Projects
Heating Distribution Upgrades - MEP
Bidding
$2,870,000 est. value
Madison, WI 53705

Heating Distribution Upgrades - General
Bidding
$2,870,000 est. value
Madison, WI 53705

Replace Boilers B415
Post-Bid
$10,000,000 to $20,000,000 est. value
Tomah, WI 54660

Boiler Replacement
Post-Bid
Milwaukee, WI 53207

Air Handling Unit Replacement
Results
$240,000 est. value
Barron, WI 54812

Steam Heat Exchanger Replacement
Results
Less than $185,000 est. value
Fox Lake, WI 53933

Arts Sculpture Laboratory - MEP
Bidding
$2,020,000 est. value
Whitewater, WI 53190

High Speed Rubberized Garage Doors
Term Contract
Post-Bid
Milwaukee, WI 53205

Boiler Replacement at Brewster Village
Results
Appleton, WI 54914

Utility Tunnel Steam and Condensate Repairs
Bidding
Waupun, WI 53963

Mechanical Ventilation Installation And Electrical Repair
Renovation
Post-Bid
Waukesha, WI 53146

Air Compressor Replacement
Results
Less than $50,000 est. value
Madison, WI 53703

Plasma Disinfection Modifications
Post-Bid
Waukesha, WI 53146

Domestic Water Heater Replacement
Results
Less than $190,000 est. value
Madison, WI 53703

Waukesha County Expo Arena Mechanical Upgrades
Post-Bid
Waukesha, WI 53188

Last Updated 11/25/2020 02:01 AM
Project Title

Utility Renovations

Physical Address View project details and contacts
City, State (County) Madison, WI 53703   (Dane County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 - replace 600 LF direct buried steam, condensate & compressed air piping between the central utility tunnel and Tallent Hall. The replacement includes excavation to expose the existing direct buried pipes, remove existing pipes, install new pipes, site restoration to match existing of all areas disturbed. Phase 2 - Waterproofing the top and sides of the existing, underground central utility tunnel, repair leaks in enclosure of the tunnel including addressing spalling concrete and filling in the 'crotch' areas at vaults with flowable fill. Drain tiles will be installed alongside the entire tunnel on both sides. Trees in the utility tunnel defined access areas will be removed. Replace steam expansion joint #4 and anchor A7 within the central utility tunnel and remove water valve WV-29 and water valve extensions near Tallent Hall. Excavation and shoring required.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Operation and Maintenance of HVAC Systems, Operation and Maintenance of Central HVAC Equipment, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents