Similar Projects
Brentwood Boulevard Sewer and Water Main - 562-56392 - City of Brentwood
Infrastructure
Conception
$2,812,000 est. value
Brentwood, CA

Berths 177-178 Wharf Restoration - Port of Los Angeles - Construction Division
Infrastructure
Conception
$11,400,000 est. value
Los Angeles, CA 90081

San Joaquin Pipeline Valve and Safe Entry Improvements - Phase 1B
Infrastructure
Bidding
$14,000,000 est. value
Stockton, CA

Pipeline 5 Relining, North Twin Oaks Valley Road to Crossover Pipeline Turnout
Infrastructure
Bidding
$27,000,000 est. value
San Diego, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Ac Water Group 1027A - City Of San Diego
Alteration
Conception
$900,000 est. value
San Diego, CA 92101

Scripps Ranch Improvement 1
Infrastructure
Bidding
$5,930,000 est. value
San Diego, CA

Trinidad Fire Station - Potable Waterline Installation or Connection
Infrastructure
Post-Bid
Trinidad, CA 95570

Los Nietos, Line D, Sorensen Lateral
Infrastructure
Results
$500,000 to $775,000 est. value
Los Nietos, CA 90610

Airport Pond/Sewer Repair - 50358 - City of Chico
Infrastructure
Conception
$448,500 est. value
Chico, CA 95973

Flow Monitoring Services
Term Contract
Bidding
Fountain Valley, CA

California Village Infrastructure Project
Infrastructure
Post-Bid
Needles, CA

Reported 06/23/2022 02:59 PM
Project Title

Water Line Replacement - Hilltop Road / Oak Knolls - CP76300036 - City of Simi Valley

Physical Address View project details and contacts
City, State (County) Santa Susana, CA 93063   (Ventura County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected May 2023, Construction Completion Expected November 2023
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This proposed project would install 1,840 feet of pipeline in Hilltop Road and Oak Knolls, located in the Santa Susana Knolls Area, to replace badly corroded 2" PEP and 2" and 5" steel pipelines that have been repaired several times by Waterworks District staff in response to emergency failures. By installing the new pipelines, water service reliability would improve existing properties. The plan is to complete the design by March 2023 and complete construction by August 2023. Project is included in the City of Simi Valley's FY 2022 - 2027 CIP. As of June 22, 2022, information regarding a design team and a general contractor is not available. Design is anticipated to be completed by March 2023 and construction is anticipated to be completed by August 2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents