Similar Projects
HVAC System Maintenance Services for CCSU
Bidding
New Britain, CT

HVAC Contractor Services
Bidding
East Hartford, CT

HVAC and Boiler Systems Preventative Maintenance Services 2019
Post-Bid
Hartford, CT

West Woods Upper Elementary School Dehumidification Project
Post-Bid
Farmington, CT

HVAC, Hartford, CT
Results
Hartford, CT 06110

Sales Booth HVAC (H)
Results
Hartford, CT 06141

Rooftop Air Handling Unit at Bristol Board of Education Administration
Bidding
Bristol, CT 06010

HVAC Preventive Maintenance Services
Post-Bid
Hartford, CT

Todesign Replacement of Geothermal HVAC System at the Avon Free Public Library
Results
Avon, CT 06001

BHS Exterior Ductwork
Bidding
Berlin, CT

HVAC Systems and Domestic Hot Water Upgrades
Post-Bid
Newington, CT 06111

Air Handling Units (AHU) - 10 Humidifier Replacement
Results
Less than $96,206 est. value
Farmington, CT

J045--PM Boiler Burners
Post-Bid
Newington, West Haven, CT

Design and Build Stowe Early Learning Center HVAC Upgrade
Results
Enfield, CT 06082

General and Specialty Repair Services
Term Contract
Post-Bid
Newington, CT 06111

Reported 05/13/2020 12:00 AM
Project Title

Replacement of Air Conditioning Condensing Units at the Windsor Locks Public Library

Physical Address View project details and contacts
City, State (County) Windsor Locks, CT 06096   (Hartford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified Mechanical Contractors to provide a turnkey replacement of the existing air conditioning condensing units and air handling unit DX coil at the Windsor Locks Public Library. Replace the air conditioning equipment as follows: 1. Replace two existing Trane 15 ton air cooled condensing units with two new 15 ton condensing units. 2. Replace existing direct expansion (DX) cooling coil in existing 12,300 cfm Trane Climate Changer air handling unit with new matching DX cooling coil. 3. Replace all existing refrigeration piping and refrigerant piping accessories. 4. Provide electrical work as required. 5. Provide new DDC temperature controls integrated with the existing Energy Management & Controls System.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents