Similar Projects
2022 Bond - Proposition B - McDade Independent School District
Addition, Demolition, Renovation, Infrastructure
Conception
$23,000,000 CJ est. value
McDade, TX 78650

2023 Bond Passed - Bastrop Independent School District
Addition, Demolition, New Construction, Renovation, Infrastructure
Conception
$321,500,000 CJ est. value
Bastrop, TX 78602

Carr Lane Manufacturing Facility
New Construction, Infrastructure - 49,948 SF
Design
$4,400,000 CJ est. value
Elgin, TX 78621

Yerico Manufacturing Warehouse
New Construction, Infrastructure - 30,000 SF
Design
$2,500,000 CJ est. value
Elgin, TX 78621

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Westside Collection System Improvements Phase 2
Infrastructure
Results
$5,500,000 est. value
Bastrop, TX 78602

Elgin County Line Road Widening Phase I Roadway and Drainage Project
Infrastructure
Results
$6,789,518 CJ est. value
Elgin, TX 78621

Project Echo - SpaceX Facility / Texas
New Construction, Infrastructure - 521,521 SF
Construction
$43,000,000 CJ est. value
Bastrop, TX 78602

Smart Painting Offices / Elgin
New Construction, Infrastructure - 9,150 SF
Construction
$150,000 CJ est. value
Elgin, TX 78621

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Yerico Manufacturing - Manufacturing Space & Accessory Office
New Construction, Infrastructure - 20,064 SF
Design
$4,000,000 CJ est. value
Elgin, TX 78621

ADELTON - Section I, Phase I - Sitework / Planting / Irrigation
Infrastructure
Post-Bid
$270,000 CJ est. value
Bastrop, TX 78602

2022 Street Improvements Project
Infrastructure
Results
$351,393 CJ est. value
Elgin, TX 78621

Last Updated 10/10/2023 05:32 AM
Project Title

County Line Road Construction Project

Physical Address View project details and contacts
City, State (County) Elgin, TX 78621   (Bastrop County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $3,090,700 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

County Line Road Construction Project. The project is along County Line Road at Elm Creek Crossing and the work will include roadway and drainage improvements. CULVERT STA 18+89.81 NBI 142270AA1545002 CULVERT STA 20+28.08 NBI 142270AA1545501 The Official Bid Form for this Contract will be made available to prospective bidders who have met all prequalification requirements on or before 5:00 PM local time, on September 6, 2023 Prequalification requirements: Be registered with State of Texas, Be fully prequalified by Texas Department of Transportation (TxDOT), Have a bidding capacity per TxDOT prequalification system of $4,000,000 Submit a valid Non-Collusion Affidavit, Debarment Affidavit, and Child Support Statement For questions related to the Declaration contact: Jerome Guerrero HUB Program Specialist Phone: (512) 854-9700 Email: hubstaff@traviscountytx.gov Each bid must be accompanied by a Bid Guaranty consisting of a Bid Bond (on the form provided) in the amount of at least five percent (5%) of the Total Bid Amount. The apparent low bidder shall deliver the original sealed Bid Bond to CTRMA within five (5) calendar days of such notification. WHEREAS, Principal is required to furnish a bond guaranteeing the faithful performance of its obligations under the Contract Documents after Final Acceptance, including payment of claims, subcontractors, suppliers, material, men and mechanics, as a condition to release of the Performance Bond and Payment Bond with respect to the Project by Obligee. An overall combined goal of 20.13% has been established for Historically Underutilized Businesses (HUB) per the Travis County HUB Program The contractor will have one hundred forty-seven (147) working days after the date stated in the written Full Notice to Proceed to achieve full completion of all work. The Authority reserves the right to make changes in the work to complete the contract, as defined in the specifications. Upon execution of the contract, a Partial Notice to Proceed (NTP) may be issued at the sole discretion of the Authority to allow the Contractor to perform such tasks as secure materials on hand, produce shop drawings for approval, etc. No time charges will be incurred until a Full NTP is issued A Full NTP will be issued no later than 180 calendar days after award for the Contractor to begin work. Time charges will begin accruing upon issuance of the Full NTP. Question Deadline 09/05/2023 at 12:00 PM CT

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents