Similar Projects
WWTP 48 Inch Pipe Replacement Project-Construction
Results
Sarasota, FL

Design-Build Services for Master Lift Station 5 Force Main Extension to Master Lift Station 1-M
Results
Bradenton, FL

Force Main Pipe Cleaning
Term Contract
Results
FL

Holmes Boulevard Force Main Replacement
Results
Holmes Beach, FL 34217

Smoke Testing and Manhole Inspection
Term Contract
Results
Sarasota, FL

Bradenton Beach Gravity Sewer Replacement
Infrastructure
Results
Bradenton Beach, FL

Sanitary Sewer, Stormwater, Line and Manhole Rehabilitation Services
Results
Less than $1,200,000 est. value
Bradenton, FL

Lift Station 10 Force Main Replacement Project
Results
Less than $500,000 est. value
Bradenton, FL 34205,

Rubonia Water Quality Improvement Project
Results
Palmetto, FL

Pipe Desilting, Video Inspection, Mapping
Infrastructure
Results
$300,042 est. value

Districtwide Storm Sewage Inspection
Infrastructure
Results

Sewer Screening System for Detention Center
Results
Palmetto, FL 34205

Installation of Force Main at 41st Avenue East and I-75
Results
Bradenton, FL 34208

Basin 16 Gravity Sewer Rehabilitation
Results
$1,438,644 est. value
FL

City-Wide Sanitary Sewer Main Lining and Rehabilitation
Infrastructure
Results
Sarasota, FL

Last Updated 01/12/2022 08:06 AM
Project Title

Bradenton Beach Gravity Sewer Replacement

Physical Address View project details and contacts
City, State (County) Bradenton Beach, FL 34217   (Manatee County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,997,901
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bradenton Beach Gravity Sewer Replacement project is along Gulf Dr in Bradenton Beach, FL between 6th Street and 13th Street. 1. Mobilization. 2. Maintenance of Traffic (MOT). 3. Permitting. 4. Replacing approximately 4,400 LF of 8- to 12-inch gravity sewer installed via open cut. 5. Replacing approximately 550 LF of 8-inch gravity sewer installed via close tolerance HDD. 6. Installation of approximately 23 proposed manholes. 7. Grout filling and abandoning existing gravity sewer and 25 associated manholes. 8. Removing and reconnecting approximately 93 service laterals to the proposed sanitary sewer. 9. Restoration of sidewalks, driveways, and pavement that will be disturbed by the construction of the proposed improvements.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents