Similar Projects
Kankakee High School New Field House & Community Center
New Construction
Design
$14,500,000 to $16,500,000 est. value
Kankakee, IL 60901

Menards / Bradley
New Construction, Infrastructure - 200,000 SF
Design
$25,000,000 CJ est. value
Bradley, IL 60915

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Water Main Improvements
Infrastructure
Post-Bid

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Post-Bid
Kankakee, IL

Bituminous Seal Coat HFE-150: 3,031.0 Gal; Seal Coat Aggregates (CA-16): 108.0 Ton
Infrastructure
Results
Bonfield, IL

Bituminous Surface Treatment
Infrastructure
Results
Bourbonnais, IL

2022 MFT Street Maintenance Program
Infrastructure
Bidding
$400,000 CJ est. value
Kankakee, IL 60901

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Road Improvements
Infrastructure
Results
Momence, IL

Overlay, Ditch Grading and Shaping
Infrastructure
Bidding
$300,000 CJ est. value
Bourbonnais, IL 60914

HMA Maintenance Overlay
Infrastructure
Post-Bid
$1,107,000 est. value
Manteno, IL

Hot Mix Asphalt Surface Course
Infrastructure
Results
$76,506 est. value
Bourbonnais, IL 60914

Grading and Shaping Ditches
Infrastructure
Bidding
$300,000 CJ est. value
Bourbonnais, IL 60914

Last Updated 12/13/2022 05:10 PM
Project Title

St. Anne CHSD 302 - High School Athletic Field

Physical Address View project details and contacts
City, State (County) Saint Anne, IL 60964   (Kankakee County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Athletic Facility, Maintenance, Park/Playground, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $5,209,229 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the new installation of turf field with associated underground drainage system, new grandstand with press box, new support building housing restrooms, team rooms, storage and concessions, site lighting, site paving, outdoor track resurfacing and related MEP scope as indicated in the Bid Documents. H. Construction Contract: Bids will be received for the following Work: 1. Single Prime Contract. Bid security shall be submitted with each bid in the amount of 10 percent of the bid amount. No bids may be withdrawn for a period of 60 days after opening of bids. Security shall be either certified check, cashier's check or bid Bond issued by surety licensed to conduct business in the State of Illinois. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. 2. Bidders' Questions: Architect will provide responses at Prebid conference to bidders' questions received up to two business days prior to conference. B. Prebid Tour: Following the Prebid meeting there may be a tour of the project site or work area. Additional tours may be scheduled by contacting the Owner. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A. Within ten (10) days after notification of award of contract, the successful Contractor shall furnish a Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner. The Performance Bond shall be in the amount of 100 percent of the contract. The performance bond will become a part of the contract. B. The failure of the successful bidder to enter into contract and supply the required bond and Certificates of Insurance within ten (10) days after the prescribed forms are presented for signature, or within such extended period as the Owner may grant, shall constitute a default. C. The Owner reserves the right to accept or reject any or all bids, to waive any informalities and irregularities in any bid, or to make awards in the best interests of the Owner. The Owner also reserves the right to award a partial amount of the Work rather than the entire amount. D. All bids submitted shall be valid for a period of at least sixty days from date of bid opening; the only alterations which will be allowed will be those approved by the Owner. E. All contractors submitting bids must be in compliance with the Prevailing Wage Act as enacted by the State of Illinois. F. As part of their bid, all contractors are required to sign, notarize and return the contractor certificates included with this bid packet.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents