Similar Projects
Allenspark Vault Toilet
Alteration
Bidding
CO

Replace HVAC System #49 Replace Water Soft #118
Alteration
Bidding

Community Center Cafe and Tap Equipment
Post-Bid
Louisville, CO 80027

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Saint Vrain HUB - AHU Replacement
Results
Longmont, CO 80501

Replace Windows, Stairs and HVAC at Longmont Readiness Center
Results
Less than $350,000 est. value
Longmont, CO 80501

HVAC and Mechanical Products
Term Contract
Post-Bid

NIST Building 42 Central Utility Plant - Cooling Tower Upgrade
Results
$1,000,000 to $5,000,000 est. value
Boulder, CO 80305

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Chiller Replacement
Results
Longmont, CO 80503

HVAC Protective Monitoring
Term Contract
Post-Bid
Longmont, CO 80501

Heat Exchanger Tube Bundles
Results

Nextlight HVAC System
Alteration
Post-Bid
Longmont, CO

Freeze Resistant Drinking Fountains Installation Project
Results
$15,000 to $25,000 est. value
Louisville, CO 80027

USAFA Fy22 Grease Laden Duct Cleaning Service
Term Contract
Post-Bid

Last Updated 03/17/2022 08:07 AM
Project Title

Southeast County Hub - Plumbing and HVAC

Physical Address View project details and contacts
City, State (County) Lafayette, CO 80026   (Boulder County)
Category(s) Single Trades
Sub-Category(s) HVAC, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is to provide Mechanical HVAC and Plumbing work for the Southeast County Hub building located at 1755 S. Public Road, Lafayette, CO 80026. The Project consists of the renovation of the existing Southeast County Services Hub facility, and associated site improvements. Plumbing work involves installation of a new indirect domestic water heater with hot water recirculation pumps, extension of existing CW, HW, SAN, V, and gas systems. New plumbing fixtures throughout. Existing CW, SAN and gas services to the building are existing to remain. The roof drain/storm system is existing to remain. The mechanical work consists of a new variable air volume system with new rooftop unit, VAV boxes, boilers, and air-cooled chiller.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents