Similar Projects
Mashpee Commons
New Construction
Conception
Mashpee, MA 02649

Birch Street Place
New Construction - 205,990 SF
Design
$10,000,000 CJ est. value
Milford, MA 01757

Tennis Court Replacement at War Memorial Recreation Center
Bidding
$400,000 est. value
Cambridge, MA 02138

Construction of Eight Pickleball Courts on Ashumet Road: Fencing and Color Coating
Post-Bid
Mashpee, MA

Walsh Field Improvement
Post-Bid
$570,000 est. value
Framingham, MA 01702

Brookline Reservoir Park Improvements
Results
Less than $2,020,000 est. value
Brookline, MA

O'Connell South Common Phase 2
Results
Less than $800,000 est. value
Lawrence, MA

Fenway Center - Mixed Use - Phase I
New Construction - 1,395,000 SF
Construction
$600,000,000 est. value
Boston, MA

Traders Way
New Construction - 53,200 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Salem, MA 01970

Johnson Playground and Spray Deck Site Improvements
Post-Bid
Less than $185,000 est. value
Boston, MA

Development of the Westside Riverway Park
Results
$500,000 est. value
Pittsfield, MA 01201

Mary Cummings Park Improvements
Renovation
Construction
$400,000 est. value
Burlington, MA 01803

Remove and Replace Batting Cages at the Mill River Recreation Area
Post-Bid
Amherst, MA

Hazelwood Park-Lawn Bowling Project
Results
$347,000 est. value
New Bedford, MA 02744

Washington Street Units
New Construction - 21,700 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Franklin, MA

Reported 04/01/2021 08:41 AM
Project Title

Youth Baseball and Softball Field Upgrades

Physical Address View project details and contacts
City, State (County) Hubbardston, MA   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Field 1 Majors Field (left-most field with fence around it) • Current condition is a ~60' base path with ~46' pitching distance. • Modify to 70’ base path with 50' pitching distance • As shown (p.2, 4) in the attached brochure, maintain availability of 46’/60’ for the younger kids • Dimensions of modified field are detailed in attached brochure. o Remove sod, loam and sub soil 1’ depth. o Install 8” new gravel, 4” new clay (baseball mix) o Recut sod edges on field, top existing clay with 1” new clay o Remove sprinkler heads • Labor and equipment at prevailing rates • Include materials Field 2 (middle field), convert to a softball field with the existing dimensions. • Remove loam and subsoil to 1’ • Install 8” new gravel, 4” clay (baseball mix) • Recut sod edges, top brush existing clay with 1” new clay • No changes to sprinklers • Labor and equipment at prevailing rates • Include materials

Details

Park/Playground, Demolition.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents