Similar Projects
Shining Mountain Waldorf School - Master Plan - 11.6 acres
New Construction, Addition - 146,596 SF
Conception
Boulder, CO 80304

Windler Master Planned Community
New Construction - 1,900,000 SF
Conception
Aurora, CO

Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Second Creek Farms
New Construction
Design
Commerce City, CO 80022

Cottage Park Playground Equipment
Post-Bid
Lakewood, CO 80226

Playground Surface Repair - Martinez Elementary School
Post-Bid
Greeley, CO 80631

Design-Build Services for Widefield Community Park Phase II Improvements
Results
Colorado Springs, CO 80911

Kohl Elementary School Playground
Results
$80,000 to $100,000 est. value
Broomfield, CO 80020

Basalt River Park - Phase I & II
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Basalt, CO 81621

Construction Manager at-Risk / GC - Erie Community Park Final Phase
Construction
Less than $5,350,000 est. value
Erie, CO 80516

Springs at Pena Station
New Construction
Pending Verification
Denver, CO 80249

Fisher Farm Subdivision
New Construction
Pending Verification
Timnath, CO 80731

Aspen Knolls Third Subdivision and Aspen Knolls Addition
New Construction
Design
Loveland, CO 80537

IOOF Park Renovation
Post-Bid
Gunnison, CO 81230

Falcon Regional Park Phase 2
Results
Falcon, CO 80106

Reported 05/26/2022 12:00 AM
Project Title

Providing Climbing Structures for Bouldering Park

Physical Address View project details and contacts
City, State (County) Durango, CO 81301   (La Plata County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project will require the awarded contractor to provide QTY_(3) climbing structures (1 "large", 2 "medium") as specified in this RFP and attached drawings necessary for an outdoor bouldering park. All climbing structures must utilize modular handholds that can be moved periodically to create new routing for the climbing experience. If vendor has the ability, also provide (6) integral benches that match finish of climbing structures. If vendor has the ability as well, provide anchors to accommodate the mounting of (4) slacklines on the climbing structures. All equipment will be delivered to the Fort Lewis College campus in the closest convenient location to the installation site, to allow unloading to be completed as seamlessly as possible. Standard details of the owner provided concrete pad are included for reference. Standard details for the equipment anchor location and placement are included for reference as well

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents