Similar Projects
Windler Master Planned Community
New Construction - 1,900,000 SF
Conception
Aurora, CO

Metro Center - Parcel C
New Construction
Design
Aurora, CO 80017

Jason Park Amenity Improvements
New Construction
Bidding
Englewood, CO 80110

Canyons Filing 2, 1st Amendment Lot Development Construction Project
Infrastructure
Bidding
Centennial, CO

Arapahoe County Justice Center West Employee Parking Lot Slope Stabilization and Full Depth Reclamation
Post-Bid
Centennial, CO 80112

Arapahoe County Covered Walkways
Post-Bid
Centennial, Littleton, CO 80120

Englewood Recreation Center Water Main, Fire Hydrant Assembly and ADA Ramp Installation
Results
Englewood, CO 80110

University Boulevard (SH177) Sidewalk Infill
Results
Greenwood Village, CO 80112

Fitzsimons Village East - Mixed Use
New Construction - 549,315 SF
Construction
$10,000,000 CJ est. value
Aurora, CO 80011

District Tennis Courts Repairs
New Construction
Post-Bid
Aurora, CO 80012

2020 Concrete Catch-Up Program
Results
Less than $420,891 est. value
Centennial, CO

District Running Tracks Repairs
Infrastructure
Post-Bid
Aurora, CO 80012

2019 CDBG Shepperd Avenue Project
Results
Less than $323,333 est. value
Littleton, CO 80120

Ida Park Improvements
Renovation
Post-Bid
$115,000 to $125,000 est. value
CO 80120

Ada Curb Ramp Upgrades
Results
$1,000,000 to $5,000,000 est. value

Last Updated 10/21/2021 10:25 AM
Project Title

Hoffman Park Playground and Walkways

Physical Address View project details and contacts
City, State (County) Aurora, CO 80011   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $575,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Hoffman Park Playground & Walkways project involves the replacement of playground equipment, the partial fencing of a basketball court and concrete walkways, ADA accessibility access from both parking lots, and irrigated bluegrass turf, a substantial hardly used portion of the park, to be converted to low water low growing native grasses. Work to be performed includes but is not limited to the supply and installation of the following: 1. Site Preparation 2. Water, Sediment and Erosion Control 3. Earthwork 4. Concrete Walkways 5. Sodding 6. Picnic Shade Shelter 7. Turf Conversion 8. Playground Edging, Wavy Walk and Surfacing 9. Planting 10. Irrigation 11. Site Furnishings.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents