Similar Projects
Interchange Reconstruction
Infrastructure
Conception
$44,458,000 CJ est. value
Sioux Falls, SD 57103

Interchange Reconstruction
Infrastructure
Conception
$44,458,000 CJ est. value
Sioux Falls, SD 57103

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Modify Intersection, PCC Surfacing
Infrastructure
Design
$3,600,000 CJ est. value
Harrold, SD 57536

Canyon Lake Pond Walls Reconstruction
New Construction, Infrastructure, Renovation
Bidding
$750,000 CJ est. value
Rapid City, SD 57702

Canyon Lake Pond Walls Reconstruction
New Construction, Infrastructure, Renovation
Bidding
$750,000 CJ est. value
Rapid City, SD 57702

Structure Demolition and Site Restoration
Demolition, Infrastructure
Post-Bid
Custer, SD

South Dakota State Penitentiary - Campus Wide Pavement Maintenance Phase 2
Infrastructure
Post-Bid
Pierre, SD

Pavement Rehabilitation Project - Rand Road
Results
$340,000 est. value
Rapid City, SD 57702

2021 Concrete Curb and Sidewalk Repair
Results
Brandon, SD

Village at Harmony Park
New Construction, Renovation, Infrastructure
Construction
Watertown, SD 57201

Ice Arena - Bid Pack No. 2
New Construction, Infrastructure
Construction
$787,000 CJ est. value
Watertown, SD 57201

1st Avenue Mixed Use Development
New Construction, Infrastructure - 5,000 SF
Pending Verification
$28,000,000 CJ est. value
Sioux Falls, SD 57104

1st Avenue Mixed Use Development
New Construction, Infrastructure - 5,000 SF
Pending Verification
$28,000,000 CJ est. value
Sioux Falls, SD 57104

Shoulder Widening, Modify Intersection
Alteration
Conception
$14,639,000 est. value
Deadwood, SD

Last Updated 10/10/2022 02:41 PM
Project Title

New City Hall and Police Department Facility - City of Madison

Physical Address View project details and contacts
City, State (County) Madison, SD 57042   (Lake County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Fire/Police Station, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of October 10, 2022, this project is in the conceptual phase. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Parking Spaces, 46 Parking Spaces.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Multiple Seating.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire-Suppression Sprinkler Systems, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents