Similar Projects
Tract 27 Booster Station Upgrades Project
Results
Less than $1,755,000 est. value
Tamarac, FL 33321

Sewer Lift Station Rehabilitation and Repair
Term Contract
Bidding
FL

Pump Station A-7 Upgrade P12415
Results
$1,300,000 est. value
Fort Lauderdale, FL 33301

Irrigation Pump Station Replacement at Pine Trails Park
Results
Parkland, FL 33067

Lift Station #8 Replacement
Results
Less than $1,758,348 est. value
Hallandale, FL 33009

Lift Station Replacement- Lift Station No. 71
Results
$223,176 to $642,640 est. value
Plantation, FL 33317

Wastewater Lift Station 25
New Construction
Results
Less than $412,000 est. value
Deerfield Beach, FL 33441

RAS Pump Station No.1 Replacement
Results
Less than $3,600,000 est. value
Hollywood, FL 33020

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Utility Analysis Zone 123
Results
Less than $20,340,061 est. value
Lauderdale Lakes, FL

Lift Station Improvement Project
Results
Wilton Manors, FL 33305

SW 130th Avenue Force Main and Lift Station 309 Improvements
Results
Davie, FL 33024

Design-Build Pump Station B-4 Force Main P12567
New Construction
Results
Fort Lauderdale, FL 33301

B-22 Pumping Station Replacement
Results
Fort Lauderdale, FL 33301

Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Reported 12/05/2019 01:34 PM
Project Title

Pump Stations Controls Upgrade and Maintenance

Physical Address View project details and contacts
City, State (County) Weston, FL 33326   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value $60,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, supervision, equipment, supplies, tools, materials, drawings, operator training, safety measures and all other necessary incidentals required to replace one (1) PLC (Modicon Micro 110CPU61200) with Modicon M340 PLC at each of three (3) pump stations, replace (1) PLC (Allen-Bradley MicroLogix 1100) with Modicon M340 PLC at each of two (2) pump stations, replace touch panel HMI with new touch panel at each of two (2) pump stations, install new touch panel at each of three (3) pump stations, program all new touch panels, create lift station summary and stormwater management HMI screens in GE Proficy iFix SCADA software, and install non-contact radar level transducer at each of five (5) stormwater pump stations in the City of Weston. Work includes converting program code from Modicon Micro 110CPU61200 PLC to Unity format, converting program code from Allen-Bradley MicroLogix 1100 PLC to Unity format for Modicon PLC, integration to existing GE Proficy iFix HMI/SCADA via radio telemetry and modify existing SCADA HMI screens and logic.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents