Similar Projects
Construction Manager at Risk Services for the Expanded Capacity
Post-Bid
Less than $15,000,000 est. value
Boston, MA

Boilers Annual Preventative Maintenance, Service Calls, Parts And Components
Post-Bid
Boston, MA

Operations and Facilities Maintenance Services at the John F. Kennedy Federal Building in Boston, MA
Results
Boston, MA 02203

Boiler Repairs - Barnes Building - 495 Summer Street, Boston, MA 02210
Results
Boston, MA 02210

Boilers Annual Preventative Maintenance Contract
Term Contract
Post-Bid
Boston, MA

Provide Preventive Maintenance - General Bid
Results
Less than $7,128,837 est. value
Boston, MA 02108

J--Boiler Services VA Medical Centers New England
Post-Bid
Hartford, Newington, West Haven, CT - Bedford, Jamaica Plain, Leeds, MA - Manchester, NH - Providence, RI 06111

Massachusetts Information Technology Center, MEP Preventive Maintenance Contract - General Bid
Results
Less than $653,474 est. value
Chelsea, MA 02139

Hydronic Piping, Phase 3, Thomas P. O'Neill Federal Building, Boston, MA
Post-Bid
Boston, MA

Barnstead Laboratory Water Purifcation System
Results
Boston, MA 02129

Purchase and Installation of Drinking Fountains - Various Schools
Post-Bid
Chelsea, MA

Air Compressor System Services
Results
$130,000 est. value
Chelsea, MA

Boiler Replacement and Associated Repairs at the Hernandez School and Lyndon School - General Bid
Results
Roxbury, MA

Trade Contractor FY20-22 Authority Wide Mechanical Term Contract - General Bids
Term Contract
Results
Less than $2,000,000 est. value
East Boston, MA

Artists Residence Hall Rooftop MAU Units - General Bids
Results
$900,000 est. value
Boston, MA 02115

Reported 01/07/2021 12:00 AM
Project Title

Remove and Replace the Existing 175 Gallons PVI Turbopower Domestic Hot Water Heater

Physical Address View project details and contacts
City, State (County) Winthrop, MA 02152   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $38,000
Plans Available from Municipal Agency - 12/16/20
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace the existing 175 gallons PVI Turbopower Domestic Hot Water Heater with a new 175 gallons PVI Turbopower Domestic Hot Water Heater at the William P. Gorman Elementary School

Details

Division 22 - Plumbing, Electric Domestic Water Heaters.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents