Similar Projects
Generator Replacements at Revere High School, Beachmont School and Lincoln School - General Bids
Bidding
$500,000 est. value
Revere, MA 02151

Maintenance of Prime Power and Emergency Generators
Post-Bid
Less than $185,000 est. value
Boston, MA

Transformer Replacement at West Broadway Development
Post-Bid
Less than $120,719 est. value
Boston, MA 02111

Removal, Repair and Installation of One Emergency Generator for the Hayes Pump Station
Results
Less than $20,000 est. value
Boston, MA

Switchboard - Low Voltage
Results
Boston, MA

Electrical Switches, Controls, Colis, Volt Meters and Other Electrical Equipment
Post-Bid
Boston, MA

Landside Vehicle Charging Stations Logan International Airport
Results
Less than $1,840,000 est. value
Boston, MA

Additional Security Cameras - Sub Bid
Post-Bid
$2,726,985 est. value
Boston, MA

Transfer Switches
Results
Boston, MA 02116

Purchase of One (1) 15KV Drawout Vacuum Circuit Breaker
Post-Bid
Boston, MA 02129

Provide Preventive Maintenance - General Bid
Results
Less than $7,128,837 est. value
Boston, MA 02108

Automatic Transfer Switch Replacement
Post-Bid
Less than $46,000 est. value
Roxbury, MA

Provide Preventive Maintenance - Filed Sub Bid
Results
Less than $7,128,837 est. value
Boston, MA 02108

Computer Room A/C Replacement and Associated Work - Filed Sub-Bids
Post-Bid
Boston, MA

Massachusetts Information Technology Center, MEP Preventive Maintenance Contract - General Bid
Results
Less than $653,474 est. value
Chelsea, MA 02139

Reported 01/16/2020 12:00 AM
Project Title

State House - House Chamber and Senate President’s Ceremonial Room Lighting Repairs and Security Cameras

Physical Address View project details and contacts
City, State (County) Boston, MA   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $629,000
Plans Available from State Agency - 12/18/19
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Work includes, but is not limited to, removing and replacing 109 light fixtures within the house chamber dome, installing LED retrofit fixtures, furnishing and installing lighting controls. Senate President’s Ceremonial Room work involves furnishing and installing LED lamps and lighting controls, providing two new light fixtures and installing gypsum board/plastering/painting of ceiling. Project also includes furnishing and installing 59 security cameras, programming, and integrating existing cameras into the system. Patching of ceilings and walls as required to accommodate the installation.

Details

Division 26 - Electrical.
Division 28 - Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents