Similar Projects
Theriot Terrace Apartments
New Construction - 2,460 SF
Design
$500,000 to $1,000,000 CJ est. value
Sterling Heights, MI 48312

Heritage Park Church Restoration
Renovation
Bidding
Taylor, MI

Crosswinds Marsh Restroom Facility
New Construction
Bidding
New Boston, MI 48164

Wilderness State Park, Phase V - East Campground Improvements
Post-Bid
Carp Lake, MI

Woodland Roadside Park - P710 (Barry County)
Post-Bid
MI

Brandon Park Expansion
Results
Ortonville, MI

Riverside Boat Launch Bathroom Rehabilitation
Results
Port Huron, MI

City Line Apartments
New Construction
Construction
Kentwood, MI 49548

Blueberry Park Improvements
Renovation
Bidding
Montrose, MI

Lake Antoine Park Playground Equipment Replacement Project
Post-Bid
Iron Mountain, MI

Schiffer Park Improvements
Results
Less than $357,700 est. value
Ferndale, MI

Winter Park Lighted Tubing Hill
Term Contract
Bidding
Bloomfield Hills, MI 48304

Rejuvenation of Kalamazoo Central Baseball and Softball Fields
Post-Bid
Kalamazoo, MI

Midland Public Schools District Wide Athletic Renovations
Results
Midland, MI

Soccer Field Press Box Replacement
Post-Bid
Howell, MI

Last Updated 08/03/2021 08:21 AM
Project Title

Veterans’ Park – 2021 MNRTF Grant Improvements

Physical Address View project details and contacts
City, State (County) Stanton, MI   (Montcalm County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Park/Playground, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all material and constructing the following: Following the clearing, grubbing, and grading of the proposed project area construct storm drainage system, a new gravel parking lot, chips & fines walkways, vault restroom building, bike racks, and (1) new little league ballfield. The field will have backstop, galvanized chain-link fencing with gates, home plates, bases, pitchers mounds, benches, and a stone dust infield. The site will be restored with turf grass. An accessible chips & fines connector trail with trailhead including bike repair station, sign, and bench to the Fred Meijer Heartland Trail is also part of this grant funded project.

Details

Park/Playground, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents