Similar Projects
Rogers High School Replacement
New Construction
Design
Newport, RI 02840

Goff Middle School Roof Replacement, Fire Code Upgrades and Steam Room Renovation
Renovation
Bidding
$600,000 est. value
Pawtucket, RI 02861

Rogers High School Replacement Project - Construction Manager at Risk Team
New Construction - 160,000 SF
Post-Bid
$77,700,000 to $98,800,000 est. value
Newport, RI 02840

2021 Capital Improvements Project
Renovation
Post-Bid
North Kingstown, RI 02852

Design Services for Rogers High School Replacement Project
New Construction - 160,000 SF
Results
$77,700,000 to $98,800,000 est. value
Newport, RI

Charles E Shea High School
Renovation - 76,900 SF
Results
$37,500,000 est. value
Pawtucket, RI 02860

Construction of New School Administration Offices
Build-Out
Construction
Lincoln, RI 02865

Ferri Middle School Renovations
Renovation
Pending Verification
$39,000,000 est. value
Johnston, RI 02919

Johnston High School Renovations
Renovation
Pending Verification
Johnston, RI 02919

High School Media Center Renovation
Renovation
Post-Bid
Burrillville, RI

Renovation of Offices at Cumberland High School
Renovation
Results
Cumberland, RI 02864

Construction Manager At Risk
Renovation, Addition, Infrastructure - 84,171 SF
Post-Bid
$33,306,000 est. value
Providence, RI 02907

2021 Capital Improvements Project for North Kingstown School Department
Renovation
Results
North Kingstown, RI 02852

Portsmouth High School Ada Restroom Renovation
Renovation
Post-Bid
Portsmouth, RI 02871

Envelope Repairs
Renovation
Results
$300,000 to $400,000 est. value
Hopkinton, RI

Reported 05/13/2022 12:00 AM
Project Title

Cranston High School West Secure Entry and Fire Alarm Upgrades

Physical Address View project details and contacts
City, State (County) Cranston, RI 02920   (Providence County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of upgrades and renovations to 2 cafeteria serveries including, electrical, mechanical and plumbing. Removal and replacement of kitchen equipment and upgrades to finishes including tile and paint. . Work Included: 1. Demolition and removal of selected portions of buildings and structures and as required for new work. Refer to the Drawings for additional requirements. 2. Salvage of existing items to be reused or turned over to the facility. 3. Removal and legal disposal of demolished materials off site. Except those items specifically designated to be relocated, reused, or turned over to the facility, all existing removed materials, items, trash and debris shall become property of the Contractor and shall be completely removed from the site and legally disposed of at their expense. Salvage value belongs to the Contractor. On-site sale of materials is not permitted. 4. Demolition and removal work shall properly prepare for alteration work and new construction to be provided under the Contract. 5. Scheduling and sequencing operations without interruption to utilities serving occupied areas. If interruption is required, obtain written permission from the utility company and the Owner.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents