Similar Projects
Blower Building 090 Blower - 23R04 - North Shore Water Reclamation District
Alteration
Conception
$1,409,400 est. value
Gurnee, IL

UV System Upgrade - Construction - 23R23 - North Shore Water Reclamation District
Alteration
Conception
$3,147,200 est. value
Gurnee, IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

RFP Construction Manager - Deerpath Community Park Synthetic Turf Fields Project
Infrastructure
Bidding
$200,000 CJ est. value
Lake Forest, IL 60045

Wingwall Replacement and Culvert Repairs
Infrastructure
Bidding
$600,000 CJ est. value
Libertyville, IL 60048

Forest Park Beach Sand Nourishment
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Lake Forest, IL 60045

Well No. 5 Generator Addition
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Grayslake, IL 60030

Wickham Court Watermain Extension
Post-Bid
Green Oaks, IL 60048

2021 Water Distribution Pressure Sensors
Post-Bid
Lake Forest, IL 60045

Pekara Watermain Lining Phase 1 and Walmart Fire Loop Lining
Results
Waukegan, IL

Water Main And Sanitary Sewer Improvements
Renovation
Results
Highland Park, IL

PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
Less than $5,368,000 est. value
Gurnee, IL

Asphalt Sealcoating and Repairs at Raw Water Pump Station, Elevated Tank and Booster Pump Station Facilities
Infrastructure
Design
$200,000 CJ est. value
Lake Bluff, IL 60044

Smart Overlay and ADA improvements
Infrastructure
Bidding
$300,000 CJ est. value
Buffalo Grove, IL 60089

Last Updated 08/03/2022 02:15 AM
Project Title

Raw Influent Valve, Actuator, & Flowmeter At the Clavey Road Water Reclamation Facility

Physical Address View project details and contacts
City, State (County) Highland Park, IL 60035   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City: Highland Park County: Lake State/Province: IL Site Directions: Clavey Road WRF Project Category Code: Meter Vault Improvements, Fittings and Valves, Sewer Force Main, Electrical and Controls, Water and Wastewater Facilities, Water/Wastewater Infrastructure Description: The work generally consists of line stopping and bypassing Distribution Chamber No. 1 by tapping two (2) existing 30 inch force mains and running temporary piping overland to Distribution Chamber No. 2. Cleaning Distribution Chamber No. 1, adjusting the existing sluice gates, and performing the necessary repairs. The contractor is to remove an existing 48 inch venturi meter and an existing 30 inch ball valve and actuator. The contractor is to install a new 48 inch electromagnetic flowmeter, 30 inch ball valve, and actuator. The contractor is to provide all labor, equipment, and materials necessary to complete the work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents