Similar Projects
Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Edwardsville, IL 62025

Smith Lake Drainage Improvements - City of Wood River
Infrastructure
Conception
$1,900,000 CJ est. value
Wood River, IL 62095

North Alton Provide and Install 35ft US Flag
Infrastructure
Design
$100,000 CJ est. value
Alton, IL 62002

Tolle Lane Project Phase 2 - City of Godfrey
Infrastructure
Design
$546,750 CJ est. value
Godfrey, IL 62035

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Resurfacing and ADA Upgrades on IL 159/Troy Road
Infrastructure
Bidding
$2,000,000 CJ est. value
Maryville, IL 62062

East End Detention
Infrastructure
Post-Bid
Wood River, IL

Water Main Improvements
Infrastructure
Post-Bid

West Dunn Street Improvements
Infrastructure
Results
Edwardsville, IL 62025

Road Improvements
Infrastructure
Results
Granite City, IL

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Addition and Renovation Dorris Intermediate School
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Construction
$6,000,000 CJ est. value
Collinsville, IL 62234

Chick-fil-A / Glen Carbon
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,000,000 CJ est. value
Glen Carbon, IL 62034

2022 Bond - Highland Primary School and Middle School Addition - Highland CUSD #5
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Highland, IL 62249

Water Meters / Wood River
Infrastructure
Conception
$853,058 CJ est. value
Wood River, IL 62095

Last Updated 01/02/2023 11:02 PM
Project Title

Installation of a Second Water Meeting from Bethalto Water to Moreland Road

Physical Address View project details and contacts
City, State (County) Bethalto, IL 62010   (Madison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2019
Bids Due View project details and contacts
Estimated Value $1,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Moro Public Water District Plans to install a second water meeting from Bethalto Water to a location on Moreland Road near Parkside School; and both eight-inch and six-inch water lines east to Heartland Meadows subdivision then to Kennedy, connecting to Moreland Road. The County of Madison recently approved matching funds for this project. As of May 7, 2019 this project is in design. An awarded designer is identified. Contractor selection and a firm timeline has not been established.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents