Similar Projects
ID Bor Lake Cascades (1) Dam Crest Road Improvements
Term Contract
Design
Cascade, ID

Gaoa - Salmon River Road Corridor Rec. Site Maintenance (Surface Rock) 4Cn
Term Contract
Design
$100,000 to $250,000 est. value
ID

Utility Improvements - Ruth Avenue, Hickory Street, and Jefferson Street Project
Infrastructure
Bidding
$250,000 est. value
Sandpoint, ID 83809

Sixth Street Crossing Over Paradise Creek
New Construction, Infrastructure
Bidding
$1,000,000 to $1,300,000 est. value
Moscow, ID

Hydrated Lime for Bunker Hill Central Treatment Plant
Infrastructure
Post-Bid
Kellogg, ID 83837

Buhl and Filer Highway Districts 2021 Crushing Project
Infrastructure
Post-Bid
ID

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Acoustic Mitigation Isolation, Phase 1
Renovation, Alteration
Results
$2,400,000 est. value
Moscow, ID

State Highway 16 Water Main Improvements
Infrastructure
Bidding
Meridian, ID 83646

Bids for Crushing Gravel
Infrastructure
Post-Bid
Jerome, ID 83338

Bunker Hill Central Treatment Plant
Alteration
Results
Kellogg, ID 83837

Replacement of Irrigation Control System
Infrastructure
Post-Bid
$346,100 est. value
Twin Falls, ID 83301

Construction of Approximately 1100 feet of 8-inch Potable Water Line
Infrastructure
Results
$235,000 est. value
Nampa, ID 83687

Road Salt
Term Contract
Post-Bid
Idaho Falls, ID 83401

Waterworks Materials Restock
Infrastructure
Results
Nampa, ID

Reported 03/29/2022 12:00 AM
Project Title

Landfill NRC3 Lift C Horizontals Materials Purchase

Physical Address View project details and contacts
City, State (County) ID   (Ada County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Aggregates, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purchase and delivery of HDPE Pipe and Fittings, Geotextile and Drain Gravel to be used at the Ada County Landfill

Details

Division 32 - Exterior Improvements, Aggregate Surfacing.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents