Similar Projects
Shining Mountain Waldorf School - Master Plan - 11.6 acres
New Construction, Addition - 146,596 SF
Conception
Boulder, CO 80304

Costco / Longmont
New Construction, Infrastructure - 150,000 SF
Conception
$12,000,000 CJ est. value
Longmont, CO 80501

Boulder Country Day School Addition
Addition - 11,534 SF
Design
Boulder, CO 80301

Murphy Express #8635 / Louisville
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Louisville, CO 80027

Eldorado Canyon State Park Entrance Improvements Project
Infrastructure
Bidding
$900,000 CJ est. value
Eldorado Springs, CO 80025

RFQ Contractor - Boulder Affordable Housing Modular Factory project
New Construction, Infrastructure
Bidding
$425,000 CJ est. value
Boulder, CO 80303

Marshall Fire Homes
New Construction, Infrastructure
Sub-Bidding
$25,000,000 CJ est. value
Louisville, CO 80027

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Willoughby Corner - CB1 & Senior Building
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Lafayette, CO 80026

On-Call Boring and Maintenance Services
Results
Longmont, CO

Special Education Changing Room Remodel
Renovation
Results
Longmont, CO 80503

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

2014 Bond - New Vista High School - Boulder Valley School District
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Boulder, CO 80302

Raising Cane's #573 / Boulder
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Boulder, CO 80304

North Drive Drainage Improvements - Lyons Middle/Senior High School
Infrastructure
Design
$200,000 CJ est. value
Lyons, CO 80540

Last Updated 08/24/2022 12:01 AM
Project Title

RFP D/B - Modular Ramp Replacement - Lyons Elementary School

Physical Address View project details and contacts
City, State (County) Lyons, CO 80540   (Boulder County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $25,116 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The St. Vrain Valley School District is requesting Bids from qualified contractors, for the design, purchase and installation of stairs and ramp for modular classroom at Lyons Elementary School. General Requirements - Insurance Required - Installation Required - FOB Destination - FOB Pre-Paid Bonding Requirements - Bid Bond 10 %

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents