Similar Projects
Last Updated | 05/09/2019 08:23 AM |
Project Title | H--Storm Drain Cleaning - Salt Lake City VAMC - Base + 4 |
Physical Address | View project details and contacts |
City, State (County) | Salt Lake City, UT 84148 (Salt Lake County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. There are 106 storm-drain catch basins located throughout the Salt Lake City VA Medical Center campus. A detailed drawing of the VA Campus showing the location of each catch-basin will be provided to the contractor. Service is to be provided annually, beginning in April, or as temperatures permit. Work shall be scheduled through the COR with a minimum of 5 working days' notice, and accomplished during normal working hours, Monday through Friday between the hours of 7:00 AM and 4:30 PM. 2. The contractor shall remove the grate from each storm drain catch-basin, then using water and a vacuum truck, remove all debris from each catch-basin. Grate to be replaced as cleaning is complete. 3. Traffic control around each worksite shall be the responsibility of the contractor, and will include appropriate cones, barricades or other means to ensure a safe work area with minimal interruption of traffic flow. 4. Debris shall be disposed of at an off-campus facility in a manner consistent with all applicable City, State and Federal laws, policies, and regulations governing such material. 5. Copies of weight tickets and any other documentation from the disposal facility shall be provided to the COR as evidence of amount and proper disposal. 6. VA will provide access to water via fire hydrants at no cost to the contractor. 7. Any issues requiring repair of catch-basin or surrounding infrastructure that are discovered during cleaning shall be reported in writing to the COR. | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |