Similar Projects
Annual Contract for Sewer Clean-Out
Term Contract
Post-Bid
Salt Lake City, UT

Combination Sewer Cleaner
Term Contract
Post-Bid
Salt Lake City, UT

10600 South Water Transmission Line and Harrison Street Storm Drain and Waterline Projects
Results
Sandy, UT

S Lone Peak Pkwy Storm Drain Project
Results
Less than $249,968 est. value
Draper, UT 84020

Storm Drain Video Project to Camera Storm Drain Pipes and Structures
Post-Bid
Taylorsville, UT 84129

Rush Trail Extension Phase 2
Results
Less than $50,000 est. value
Draper, UT

1700 South Storm Drain, from 2100 E to Emigration Creek
Post-Bid
Salt Lake City, UT 84115

Construction Bates Central Kitchen, Site Drainage and Grading
Results
West Valley City, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Foothills Park Storm Drain Project
Results
Riverton, UT

Crown Street Storm Drain Improvement Project
Post-Bid
Taylorsville, UT 84129

Derby Street Storm Drain
Results
Less than $432,565 est. value
West Valley City, UT

Lone Peak Elementary Storm Drain Upgrade
Post-Bid
Sandy, UT 84092

Utahna Drive Storm Drain Project
Results
Murray, UT

2019 Midvale Storm Drain Project
Results
$200,000 to $300,000 est. value
Midvale, UT

Last Updated 05/09/2019 08:23 AM
Project Title

H--Storm Drain Cleaning - Salt Lake City VAMC - Base + 4

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84148   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1. There are 106 storm-drain catch basins located throughout the Salt Lake City VA Medical Center campus. A detailed drawing of the VA Campus showing the location of each catch-basin will be provided to the contractor. Service is to be provided annually, beginning in April, or as temperatures permit. Work shall be scheduled through the COR with a minimum of 5 working days' notice, and accomplished during normal working hours, Monday through Friday between the hours of 7:00 AM and 4:30 PM. 2. The contractor shall remove the grate from each storm drain catch-basin, then using water and a vacuum truck, remove all debris from each catch-basin. Grate to be replaced as cleaning is complete. 3. Traffic control around each worksite shall be the responsibility of the contractor, and will include appropriate cones, barricades or other means to ensure a safe work area with minimal interruption of traffic flow. 4. Debris shall be disposed of at an off-campus facility in a manner consistent with all applicable City, State and Federal laws, policies, and regulations governing such material. 5. Copies of weight tickets and any other documentation from the disposal facility shall be provided to the COR as evidence of amount and proper disposal. 6. VA will provide access to water via fire hydrants at no cost to the contractor. 7. Any issues requiring repair of catch-basin or surrounding infrastructure that are discovered during cleaning shall be reported in writing to the COR.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents