Similar Projects
Asphalt Resurface
Infrastructure
Bidding
$3,815,156 CJ est. value
Franklin, IN 46131

Asphalt Resurface
Infrastructure
Bidding
$3,815,156 CJ est. value
Franklin, IN 46131

BAPS Swaminarayan Temple Renovations and Additions - Rebid / Greenwood
Addition, Renovation, Infrastructure - 23,200 SF
Sub-Bidding
$7,500,000 CJ est. value
Greenwood, IN 46142

Greenwood Christian School Expansion / Greenwood
Addition, Infrastructure - 11,850 SF
Sub-Bidding
$8,500,000 CJ est. value
Greenwood, IN 46143

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2020 CCMG - Full Depth Reconstruction - Pavement Replacement
Results
Greenwood, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Patriot Defense Research Park - Buildings 1 & 2
New Construction, Infrastructure - 106,400 SF
Pending Verification
$57,000,000 CJ est. value
Franklin, IN 46131

Patriot Defense Research Park - Buildings 1 & 2
New Construction, Infrastructure - 106,400 SF
Pending Verification
$57,000,000 CJ est. value
Franklin, IN 46131

Johnson County Courthouse Exterior Sitework Project
Infrastructure
Bidding
$250,000 CJ est. value
Franklin, IN 46131

Indian Creek HS Fieldhouse, Auditorium, Sports Tower
Addition
Post-Bid
Trafalgar, IN 46181

2021 Street Improvement Program
Results
Bargersville, IN

Construction Inspection Services US 31 in Johnson County - 1800082 - Indiana Department of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$42,044,000 CJ est. value
Franklin, IN 46131

Scott-Highbridge Legal Drain Reconstruction
Infrastructure
Bidding
$400,000 CJ est. value
Greenwood, IN 46143

Last Updated 11/22/2022 03:05 PM
Project Title

Westside Regional Interceptor - Phase 1

Physical Address View project details and contacts
City, State (County) Franklin, IN 46131   (Johnson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,292,995 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall include: Work shall include the modification of an existing submersible non-clog lift station, approximately 4,423 LF of 15-inch PVC sanitary sewer, 244 LF of horizontal directional drilled 18-inch DR 11 HDPE, 15 manholes, Branigan Road drainage improvements, electrical equipment, asphalt drive, clean-up and restoration and all other work and appurtenances necessary for complete installation. Additionally, the Work shall include demolition and conversion of an existing lift station to a manhole. Work shall be constructed under a Unit Price Contract. Bids shall be properly and completely executed on a State Board of Accounts Form 96 (Revised 2013). Each Bid shall be accompanied by the Contractor's Bid Attachment (included with the Contract Specifications) to Form 96, a Financial Statement (completely filled out and signed) and a bid security in the form of an acceptable certified check payable to the Owner or an acceptable Bidder's bond, in an amount of not less than 5% of the total bid price, in accordance with the Contract Specifications. The Contract will be awarded in accordance with the provisions of IC 5-16-13 for Public Works projects awarded after June 30, 2015. Pursuant to IC 5-16-13-7, the provisions of the law are incorporated by reference and Contractor agrees that pursuant to IC 5-16-13-8, the public work project will not be structured other than in the Contractor tier structure required by law. Contractor shall further be required to comply with the provisions of IC 5-16-13-13, 14 in all respects including but not limited to document preservation and availability for inspection. A conditional or qualified bid will not be accepted. Award will be made to the low, responsive, responsible bidder, including but not limited to, the provisions and definitions referenced in IC 5-16- 13and IC 5-16-14. For contracts over $300,000.00, in accordance with IC 5-16-13-10 and IC 8-23-10-0.5, Contractor must be qualified under either IC 4-13.6-4 or IC 8-23-10 (Indiana Department of Administration or Indiana Department of Transportation) before doing any work on a public works project. In accordance with IC 22-5-1.7-11.1, Contractors entering into a contract with the Owner, and contractors of any tier as defined in IC 5-16-13-4, will be required to enroll in and verify the work eligibility status of all newly hired employees through the E-Verify program (effective July 1, 2011), and comply with the reporting requirements of IC 5-16-13-11. In accordance with IC 5-22-16.5, Contractors entering into a contract with the Owner will be required to provide an Indiana Iran Investment Certification. In accordance with IC 5-16-13-11, Contractor shall submit an Employee Drug Testing Plan with their Bid and contractors of any tier as defined in IC 5-16-13-4 must comply with the drug testing requirements set forth in IC 4-13-18. Contractors shall complete a Drug Testing Plan Certification to be submitted with their Bid. The Owner reserves the right to waive any informalities or minor defects in bids or bidding procedure, or reject any and all bids, or to accept the bid from the lowest most responsible and responsive bidder as exclusively determined by the Owner. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. No Bidder may withdraw a bid within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder determined by the Owner to be the lowest most responsible and responsive. Submission of a signed Bid by the Bidder constitutes acknowledgment of and acceptance of all the documents and terms and conditions of the Contractual-Legal Requirements and Technical Sections of the specifications in the Project Manual. The Contractor to whom the work is awarded will be required to furnish an acceptable Performance and Payment Bond each in the amount of 100% of the contract price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Contractor to whom the work is awarded will be required to purchase and maintain insurance coverage as described in the Contract Documents on an "occurrence basis" and in accordance with the insurance requirements and hold harmless provisions of the City of Franklin as identified in the Contractor Documents. Additionally, all Contractors (including Tier Contractors) shall be required to comply with IC 5-16-13-9 through 12. A copy of the proposed Contract is included in the Contract Documents.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents