Similar Projects
Jenkintown Stream Restoration
Infrastructure
Bidding
$850,000 est. value
Jenkintown, PA 19046

Slope Stabilization Material
Post-Bid
Conshohocken, PA 19428

Coach Mcnelly Stadium - Egress Enhancements
Post-Bid
Royersford, PA 19468

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

2020 for Ironstone Creek Streambank Stabilization Project
Results
Gilbertsville, PA 19525

Abington Environmental
Term Contract
Post-Bid
Abington, PA

Barndt / Schultz Road Culvert Replacement
Results
$90,000 est. value
Telford, PA

Sinkhole Repairs
Infrastructure
Post-Bid

Sawmill Run Creek Culvert Replacement
Results
$250,000 to $300,000 est. value
Norristown, PA

New Sandy Run Middle School - Shoring
Infrastructure
Post-Bid
Dresher, PA 19025

Well 26 Access Driveway and Box Culvert
Results
$350,000 to $450,000 est. value
Horsham, PA 19044

Mermaid Park Pedestrian Trail and Streambank Stabilization Project
Renovation, Infrastructure
Post-Bid
Wyndmoor, PA 19038

Swamp Creek Road Culvert Replacement
Results
$70,000 est. value
Schwenksville, PA

Upper Perkiomen Middle School Basin Stabilization
Infrastructure
Post-Bid
$400,000 est. value
Pennsburg, PA 18073

State Game Lands #183 Shooting Range Improvements
Results
Palmyra, PA

Last Updated 04/29/2022 05:02 AM
Project Title

Storm water Drainage Projects

Physical Address View project details and contacts
City, State (County) Worcester, PA   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The furnishing and installation of storm drainage improvements at three different locations in Township as shown on the project Location Map. The work will include various sizes and types of both High Density Polyethylene Corrugated Pipe and Corrugated Metal Pipe, inlets and endwalls as specified on the Construction Plans. Construction will occur in Township rights-of-way and involves restoration of all paved and non-paved areas, and includes provisions for all necessary traffic control and erosion and sedimentation controls.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents