Similar Projects
STEG Gravity Sewer Improvements - Stallings
Infrastructure
Bidding
Monroe, NC

Wastewater Transmission System Improvements - Contract 2
Infrastructure
Bidding
Pittsboro, NC 27312

Summer Rest Road Gravity Sewer Main Replacement
Post-Bid
$210,000 to $215,000 est. value
Wilmington, NC

East River Phase 2 Project
Post-Bid
Clayton, NC 27527

2017 Sewer Line Improvements
Results
Oxford, NC

Nash Street Sanitary Sewer Extension
Results
Sanford, NC 27237

FYLarge Service Contract 1
Infrastructure
Bidding
Charlotte, NC

Grease Trap Service - Caswell Correctional Center
Term Contract
Post-Bid
Blanch, NC 27212

Grease Traps
Results
Fort Bragg, NC 28310

Construction Services for the Infrastructure
Infrastructure
Bidding
Wilmington, NC

Orange County Cedar Grove Community Center-Septic Upgrades
Post-Bid
Hillsborough, NC 27278

Sanitary Sewer Improvements - South
Results
$977,269 est. value
Locust, NC

Twin 72 Interceptor Replacement and Rehabilitation, Upper West Neuse Interceptor Replacement and Crabtree Interceptor Phase III Improvements
Infrastructure
Bidding
$15,000,000 to $52,500,000 est. value
Raleigh, NC

Raise Covered Structures, Contract A
Term Contract
Post-Bid
Winston-Salem, NC 27102

North Hills Sewer Outfall Improvements
Results
Raleigh, NC

Last Updated 10/05/2021 11:12 AM
Project Title

Mallard Creek Interceptor Improvement Project - Phase 1 and Phase 2

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $57,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project comprises of Phase 1 and 2 of the multi-phased Mallard Creek Interceptor Improvements (Figure 1 of Exhibit 2). Phase 1 will extend from the Mallard WRF influent pumping station, to Toby Creek, near North Tryon Street (Figure 2 of Exhibit 2) and Phase 2 from Toby Creek up to Mallard Creek Road (Figure 3 of Exhibit 2). Based on condition assessments and preliminary field investigation, the first and/or second phase will potentially include rehabilitation construction of significant defects in several identified areas (Sites 33, 20 and FM-5) of the basin (Figure 4 of Exhibit 2). Estimated: 1. Phase 1 Design and Construction: $57,700,000 2. Phase 2 Design and Construction: $35,600,000

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents