Similar Projects
Water Treatment Plant Improvements Phase II (5.0 MGD)
Post-Bid
$11,700,000 est. value
Granbury, TX

Star Ranch Section 7 Phase 7 - Street Excavation and Drainage, Water, Wastewater, and Erosion Control Improvements
Post-Bid
Round Rock, TX 78664

Acton Municipal Utility District WWTP No. 1 CMAR
Results
Less than $7,000,000 est. value
Granbury, TX

Waste Water Treatment Plant Aeration Basin Improvements
Results
TX

Celina WWTP Improvements
Construction
$11,806,900 est. value
Celina, TX

Northeast WWTP Inclined UV Disinfection System Upgrades
Post-Bid
TX

Wastewater and Lift Station Improvements Phase III Project
Results
Less than $612,000 est. value
TX

Buda WWTP Phase III Expansion
Post-Bid
Buda, TX 778610

Encanto Real Utility District - 0.125 MGD Wastewater Treatment Plant Expansion
Results
$1,400,000 est. value
TX

Terrell Kings Creek WWTP Phase I Improvements
Post-Bid
Terrell, TX

Wastewater Collection System Rehabilitation and Renewal
Results
Less than $5,000,000 est. value
Houston, TX

Repair or Alteration of Sewage and Waste Facilities
Post-Bid
$1,000,000 to $5,000,000 est. value
Terlingua, TX 79834

Meyer Ranch WRRF Site Package 2
Results
TX

Granbury Phase I Wastewater System Improvements
Post-Bid
$11,700,000 est. value
Granbury, TX

Phase 2 - Oak Grove WWTP Improvements
Results
$3,750,000 est. value
TX

Reported 01/11/2019 08:23 AM
Project Title

Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Cameron, TX   (Milam County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Replacement of one (1) raw water pump and one (1) transfer pump at the existing Water Treatment Plant. The raw water pump to be replaced is the largest of three (3) pumps located in the existing raw water pump station. The transfer pump is one of three (3) pumps located in the pipe gallery
Details
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents