Similar Projects
Chain Works District
New Construction, Renovation, Addition - 1,700,000 SF
Design
$320,000,000 est. value
Ithaca, NY 14850

Chain Works District
New Construction, Renovation, Addition - 1,700,000 SF
Design
$320,000,000 est. value
Ithaca, NY 14850

Bridge Repair and Infrastructure Construction
Renovation, Term Contract
Bidding

Bridge Replacement of Central Chapel Road (CR115) over Boice Creek
Post-Bid
NY

File Room Office Conversion
Renovation - 200 SF
Post-Bid
Ithaca, NY 14850

Where and When Bridge Repair Project
Results
Less than $2,100,000 est. value

Rehabilitation of Route 13 Bridge over Six Mile Creek
Results
Less than $1,600,000 est. value
Ithaca, NY

City Harbor Waterfront Development
New Construction - 316,280 SF
Construction
$6,775,092 est. value
Ithaca, NY 14853

Hoy Parking Garage Planned Maintenance 2021
Renovation - 289,693 SF
Construction
$189,610 est. value
Ithaca, NY 14853

State Street Apartments
New Construction - 350,750 SF
Design
Ithaca, NY 14850

Dispensers Purchase For 2 LNA
Renovation
Post-Bid

Statewide Emergency Bridge Contract Regions 1 - 10
Results

Rhodes Hall 757A And 757C Cit Office Renovation
Renovation
Construction
$73,500 est. value
Ithaca, NY 14850

Dispensers Replacements At 4 Lukoil Sites
Renovation
Post-Bid

Rehabilitation of the South Cayuga Street Bridge over Six Mile Creek
Renovation
Results
Ithaca, NY

Last Updated 04/11/2022 09:47 AM
Project Title

Asteri Ithaca Mixed-Use

Physical Address View project details and contacts
City, State (County) Ithaca, NY 14853   (Tompkins County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Bridge, Office, Parking Garage
Contracting Method
Project Status Construction Commenced first quarter 2022, Construction Completion Expected December 2023, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $46,368,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

218 permanently affordable apartments on floors four thru 11, floors one thru three are amenities and conference center with 55 apartments, two outdoor spaces, seven levels of parking, pedestrian bridge.

Details

Office, New Construction, Bridge, New Construction, 1 Apartments/Condominiums, 12 Stories Above Grade, 200,000 SF New Construction 237, 1 Parking Garage, 5 Stories Above Grade, Addition.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers, Expansion Control.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Retaining Walls, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents