Similar Projects
Cape Lookout State Park Facility Relocations and Demolition
New Construction, Demolition
Conception
Tillamook, OR 97141

Medford Apartments/Springbrook Park
New Construction - 93,093 SF
Conception
Medford, OR

Oregon Coast Aquarium Renovation Phase 2
New Construction, Renovation, Infrastructure - 10,650 SF
Design
$18,000,000 CJ est. value
Newport, OR 97365

Oregon Square Plaza Pavilion
New Construction, Renovation, Infrastructure - 10,800 SF
Design
$2,000,000 CJ est. value
Portland, OR 97232

North Junction Rehabilitation
Infrastructure, Renovation
Bidding
$5,000,000 CJ est. value
Crater Lake, OR 97604

New Community Recreation Center Project
New Construction, Infrastructure - 74,000 SF
Bidding
$26,000,000 CJ est. value
Redmond, OR 97756

Winchester Bay Commercial Building
New Construction
Post-Bid
Winchester Bay, OR 97467

RFQ Design - Qualifications Based Services for Clackamas County Fairgrounds and Event Center
Term Contract
Post-Bid
Canby, OR 97013

Fieldhouse Indoor Track Surface
Renovation
Results
La Grande, OR 97850

Tualatin Community Park Restroom Improvements
Renovation
Results
$82,046 CJ est. value
Tualatin, OR 97062

Recreation and Aquatic Center - City of Lake Oswego
New Construction
Construction
$47,000,000 CJ est. value
Lake Oswego, OR 97034

Wings & Waves Waterpark and Hotel Development
New Construction, Infrastructure, Renovation - 99,000 SF
Pending Verification
$35,000,000 CJ est. value
McMinnville, OR 97128

Gradin Sports Park Development - CIPPK00001 - City of Gresham
New Construction, Infrastructure
Conception
$4,540,020 CJ est. value
Gresham, OR 97080

Broadway Field Renovation
New Construction, Infrastructure
Design
$4,600,000 CJ est. value
Seaside, OR 97138

RFP- Stoneridge Park Construction Documents & Professional Services
Term Contract
Bidding
$1,600,000 CJ est. value
Tualatin, OR 97062

Last Updated 05/12/2023 11:34 AM
Project Title

Ko-Kwel Shishda Haws

Physical Address View project details and contacts
City, State (County) Coos Bay, OR 97420   (Coos County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,325,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Coquille Indian Tribe is requesting Bids for the construction of the Ko-Kwel Shishda Haws, a 13,413 sq ft Rehabilitation and Fitness Center to be constructed on the Kilkich Indian Reservation near Coos Bay. The Project includes Construction of a new single-story rehabilitation and fitness facility building with an enclosed floor area of 8,912 sq ft and adjacent covered, multi-use court of 4,501Square Feet. Programming includes three exam rooms with office space for providers, a large fitness classroom for 25 participants and partitioned for smaller groups, equipment floor area for cardio, exercise and weight equipment, and space for stretching. Additionally, there will be space allocated for an all-ages bouldering wall. Common areas include reception, non-gender specific restrooms, shower rooms, and infrared sauna amenities. The program includes dedicated equipment storage, table cart storage, general storage, laundry facilities and a receiving bay. The Shishda Haws will include a cafe space that allows members of the clinic, staff, and the tribal community to access healthy food options. The cafe is an open space located in the main entrance to allow for access without a key card. KWC will contract with a locally sourced vendor to provide grab and go options prepared at an off-site commercial kitchen and stocked during KWC business hours. The cafe will provide basic refrigeration, equipment for coffee, and seating. Staffing and operationalization for food services will be based on contracts and staffing. The tentative plan is for the contractor to operate the cafe at no cost for the lease as a service to the membership and receive revenues for the services. Natural play areas will be built around the exteriors of the building. Construction of natural playscapes to engage children physically and intellectually by using large boulders and logs to create tactile learning play spaces. Playscapes will include structural elements created from wood and stone such as log steppers, balance Logs, vertical and crisscross log climbers, boulder scrambles and rock walls. The elements will be strategically positioned along and around stormwater retention features and earthen embankments on the east side of the building and north end of the site between the multi-use court and earthen embankment. The elements will be integrated with landforms taking advantage of the topography and hydrology to offer unique experiences that challenge dexterity and balance and encourage climbing and jumping and physical exertion in a safe, outdoor space. The playscapes will incorporate sand and water play stations and native vegetation with child-sized play structures and tactile wayfinding to expose children to culturally significant stories and traditions, and native plants. There will also be space set aside in the small gravel area to the south of the building for a fenced playground with structures and amenities that cater to pre-school and early school-age children. There will be a multi-use pedestrian path around the perimeter of the site to occupy portions of the earthen embankment and access road encircling the former cranberry bogs. The anticipated path would be nominally 6' wide and approximately 1/10th of a mile in length. The path would be constructed of gravel and/or soil-stabilization mixture to create a hardened base. The path will be surfaced with organic wood fiber (hog fuel) that when compressed is erosion resistant ant suitable for walking, running and bicycle use in all weather. The path would connect to existing and proposed pedestrian trails and sidewalks, with benches strategically located to offer respite and quiet relaxation. Pre-Qualification: Yes Site Directions: Kilkich Indian Reservation 650 Miluk Dr. Coos Bay OR 97420

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents