Similar Projects
Boiler Replacement at T. M. Elmore Gymnasium
Post-Bid
Huntsville, AL 35811

Alabama Supercomputer Center HVAC Systems Replacement
Alteration
Post-Bid
Huntsville, AL 35806

Horizon Elementary HVAC Renovation
Results
$3,264,000 est. value
Madison, AL 35758

Heritage Elementary HVAC Renovation
Results
$1,997,300 est. value
Madison, AL 35758

Sparkman High School Cooling Towers Replacement
Post-Bid
Harvest, Huntsville, AL 35749

Dublin Park H and V Unit Replacement Project
Results
Madison, AL 35758

AHU and Boiler Replacement Student Health and Wellness Center
Alteration
Post-Bid
Huntsville, AL 35811

Alabama A&M University Thomas Wing at Carver Complex HVAC Renovation
Alteration
Results
$3,239,800 est. value
Huntsville, AL

MSFC Huntsville Bldg 4619
Term Contract
Post-Bid
Huntsville, AL 35808

National Boiler Inspection Services
Term Contract
Results

Inspection and Certification of Chemical Fume Hoods, Laminar Flow Hoods, Class Two Recirculating Bio-Safety Cabinets (BSC), Class Two Ducted BSC's, and Associated Alarms
Term Contract
Post-Bid
Huntsville, AL - Fredericksburg, Stafford, VA 22556

HVAC Renovation/Replacement for Highlands Elementary School
Alteration
Results
$2,220,000 est. value
Huntsville, AL 35810

Madison County High School Fluid Cooler Replacement
Alteration
Post-Bid
Gurley, AL 35748

HVAC Filter Maintenance
Term Contract
Results
AL

Hunts-UAB Regional Med Health Ctr HVAC Replacement
Alteration
Post-Bid
$900,000 est. value
Huntsville, AL 35801

Last Updated 09/15/2022 03:02 AM
Project Title

ETF 2 nd Floor HVAC System Replacement

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35805   (Madison County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,569,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Complete HVAC system including installation and start-up, for the ETF Building located on the campus of the U.S. Space and Rocket Center, 1 Tranquility Base, Huntsville, Al 35805. The complete HVAC System is comprised of, but not limited to the following: 40 Ton commercial rooftop unit, complete with R-410A Refrigerant Dual Coil Guards Controls for replacement unit must communicate with existing control system. a. Comfort Network, United Technology Co. b. Model No. CC6400 c. 115V d. 25Amps e. Single Phase Must not to exceed the dimensions of the current Carrier model 50AK-040FDQ73884 installed. New replacement unit shall be compatible with existing duct work and electrical supply. Remove/disposal of the existing cooling unit and delivery, installation, and startup of a new cooling unit. Work performed will be a turnkey solution to encompass the complete disconnect and removal of the existing Carrier Model 50AK-040FDQ73884 Must have experience overseeing the creation and implementation of a critical heavy left plan. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Owner. The bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgement, the best interests of the Owner will thereby be promoted. You may also submit your seal bid prior to public bid opening to the Director of Procurement, for the U.S. Space and Rocket Center, by coming in person to the Administration Entrance located at the U.S. Space and Rocket Center, One Tranquility Base, Huntsville, Al 35805 Huntsville. Qualified firms shall provide all labor, materials, and equipment necessary to deliver and install the HVAC System on the target installation date of Monday October 3rd , 2022.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents