Similar Projects
Woods Creek Reach 11 Restoration
Infrastructure
Bidding
$1,500,000 est. value
Lake in the Hills, IL 60156

Woods Creek Reach 11 Restoration
Infrastructure
Bidding
$1,500,000 est. value
Lake in the Hills, IL 60156

Expressway Mowing North
Post-Bid

Expressway Mowing North
Post-Bid

Wedgewood Pond Shoreline Stabilization
Results
Lake in the Hills, IL

Tree Removal
Infrastructure
Results

Landscape Maintenance Services
Term Contract
Post-Bid
Cary, IL

District Wide On-Call Tree Removal
Infrastructure
Results

Statewide Natural Areas Management
Term Contract
Post-Bid

Ecological Restoration
Infrastructure
Results

100 Tree Planting
Post-Bid
Crystal Lake, IL

Sewer Televising And Lining
Infrastructure
Results
Crystal Lake, IL

The Knoxville United Methodist Church Lawn Care
Post-Bid
Knoxville, IL 61448

Culvert Repairs
Infrastructure
Results
McHenry, IL 60051

Prairie Trail South, Crystal Creek Bridge Streambank Stabilization
Infrastructure
Post-Bid
Algonquin, IL

Last Updated 03/29/2022 01:06 PM
Project Title

Hennings Subdivision Completion of Infrastructure Contract C Stormwater Management

Physical Address View project details and contacts
City, State (County) Huntley, IL   (McHenry County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Landscaping, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work will consist of the following: The work included in the bid shall consists of the: A. Rough and fine regrading of ditches, a swale, and the high waterline of basin L to match engineering contours. B. Seeding and blanketing of all disturbed areas. C. Removal of 6 inches of sediment from a storm pipe by either water vacuuming or by hand. D. Improvements to an existing rock check dam. E. Repair of existing level spreader including removal of eastern 3 feet of the existing 18 inch perforated pipe, recapping pipe, and installation of rock on top of pipe.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents