Similar Projects
The Firs At Talus
New Construction, Infrastructure
Conception
Issaquah, WA 98027

Fall City Floodplain Restoration Construction
Infrastructure
Design
$12,500,000 est. value
WA

Brightwater Aeration Basin Optimization
Infrastructure
Design
$5,500,000 est. value
WA

Lower Satsop Right Bank Conservation
Infrastructure
Post-Bid
Montesano, WA

Coon Creek Fish Passage Barrier Removal Project
Alteration
Post-Bid
Granite Falls, Snohomish, WA 98252

Sammamish River Cis
Alteration
Design
$1,200,000 est. value
WA

Environmental Remediation MAIDIQ (ERMA FY23)
Term Contract
Post-Bid

Lake Hills and NW Lake Sammamish Interceptor Upgrade
Infrastructure
Design
$70,000,000 est. value
WA

Herzman Levee Setback Construction
Infrastructure
Design
$4,200,000 est. value
WA

Mitigation Fairwood - 4 Phase - 2 Molasses Creek
Infrastructure
Design
WA

Lake Hills Interceptor Phase II
Alteration
Design
$13,330,000 est. value
WA

Fountain Ilse D91126
Infrastructure
Design
$300,000 est. value
WA

Madsen Dam DR0642
Infrastructure
Design
$300,000 est. value
WA

Brps Seismic Upgrades
Infrastructure
Design
$14,000,000 est. value
WA

Madsen Basin Retrofit
Infrastructure
Design
WA

Last Updated 02/01/2022 09:06 AM
Project Title

Nason Creek Kahler Reach Habitat Enhancement Project

Physical Address View project details and contacts
City, State (County) Wenatchee, WA 98801   (Chelan County)
Category(s) Environmental
Sub-Category(s) Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $718,000 to $794,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Contract provides for the improvement of fish and aquatic habitat in Nason Creek between River Miles (RM) 6.5 and 7.5. This Contract is associated with work at Site 1 and Site 2. The work includes, but is not limited to: temporary traffic control as needed to safely deliver, handle, and stage equipment and materials; permanent and temporary improvements of access routes; clearing and salvage of trees and shrubs for use in Engineered Log Jam (ELJ) construction; isolation of work areas from a flowing stream channel and excavation dewatering; control of in-water turbidity; temporary bridge stream crossing; furnishing materials for and performing construction of ELJ habitat structures; seeding and other work.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 32 - Exterior Improvements, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents